5
3
CONNECTIONS, CABLES AND PIN OUTS
PORT
PIN
OUT
FREQ
1
GND
2
+12 Vdc
3
OUT (Square wave signal)
CAN
1
GND
2
+12 Vdc
3
CAN L
4
CAN H
PORT
PIN
OUT
FREQ
1
GND
2
+12 Vdc
3
OUT (Square wave signal)
4
Pump check
CAN
1
GND
2
+12 Vdc
3
CAN L
4
CAN H
THE CONNECTING CABLES MUST BE ORDERED SEPARATELY.
4
HYDRAULIC CONNECTIONS
For the connection to the system, use T9 fittings with fork coupling (Ref. ARAG General catalog).
Avoid bottlenecks or twists before the fittings and on pipes.
For the connections, use pipes and fittings duly dimensioned for system operating pressure (MAX 5 bar).
Hose tails must be tightened with special metal clips ensuring a perfect sealing even at high pressure values.
The connection with threaded fittings must be carried out by taking into account the operating pressure.
WARNING: For the implementation on already operating systems, it is necessary to follow all safety rules described herein.
System assembly and start-up must be carried out by expert personnel according to the safety rules so as to ensure the same
safety level of the system where the flowmeter is installed.
Содержание orionX
Страница 1: ...4629XXXX ELECTROMAGNETIC FLOWMETER INSTALLATION USE AND MAINTENANCE VISUALFLOW...
Страница 15: ...Notes 15...