General
Residential
Installation
Check
List
Water
Pressure
A minimum of 20 psi water pressure is required for regeneration valve to operate effectively.
Electrical
Facilities
An uninterrupted alternating current (A/C) supply is required. Please make sure voltage supply is compatible with
unit before installation.
Existing
Plumbing
Condition of existing plumbing should be free from lime and iron buildup. Replace piping that has heavy lime and/
or iron build-up. If piping is clogged with iron, install a separate iron
filter unit ahead of the water softener.
Location
of
Softener
and
Drain
Locate the softener close to a clean working drain and connect according to local plumbing codes.
Valve
Installation
and
Start-Up
Procedures
Bypass
Valves
1. Always provide for the installation of a bypass valve if unit is not equipped with one.
2. Place the softener tank where you want to install the unit.
NOTE:
Be
sure
the
tank
is
level
and
on
a
firm
base.
3. During cold weather it is recommended that the installer warm the valve to room temperature before
operating.
4. Perform all plumbing according to local plumbing codes.
— Use a 1/2” minimum pipe size for the drain.
— Use a 3/4” drain line for backwash flow rates that exceed 7 gpm or length that exceeds 20’ (6 m).
5. Cut the
1” distributor tube (1.050 O.D.) flush with top of each tank.
6. Lubricate the distributor o-ring seal and tank o-ring seal. Place the main control valve
on the tank.
NOTE:
Use
only
non-petroleum
based
silicone
lubricant.
7. Solder joints near the drain must be done before connecting the Drain Line Flow
Control
fitting (DLFC).
8. Leave at least
6” (152 mm) between the DLFC and solder joints when soldering pipes
that are connected on the DLFC. Failure to do this could cause interior damage to
DLFC. Use only Te
flon tape on the drain fitting.
9. Be sure the
floor under the salt storage tank is clean and level.
10. With a grid plate ensure the air che
ck fill mark is above the grid plate. With or without a
grid plate
, fill the brine tank with water to the mark indicated on the air check assembly.
See illustration to the right.
11. On units with a bypass, place in the bypass position.
— Turn on the main water supply.
— Open a cold soft water tap nearby and let water run a few minutes or until the
system is free of foreign material (usually solder) resulting from the installation. Close
the water tap when water runs clean.
12. Place the bypass in the in service position and let water
flow into the mineral tank.
When water
flow stops, slowly open a cold water tap nearby and let water run until air
is purged from the unit. Then close tap.
13. Plug the valve into an approved power source. When the valve has power it drives to
the in service position.
Page 4
Содержание WaterPro
Страница 20: ...6700XTR Powerhead Assembly 61501 6700_REVC Page 20...
Страница 22: ...Control Valve Assembly 61500 6600 6700_DF_REVB Page 22...
Страница 32: ...Water Conditioner Flow Diagrams Service Position Backwash Position Page 32...
Страница 33: ...Water Conditioner Flow Diagrams Brine Slow Rinse Position Rapid Rinse Page 33...
Страница 34: ...Water Conditioner Flow Diagrams Brine Tank Fill Position Page 34...
Страница 35: ...Valve Wiring Diagram Page 35 42139_REVA...
Страница 37: ...Notes Page 37...
Страница 38: ...Notes Page 38...
Страница 39: ...Notes Page 39...