CONDENSATION BOILER
AQUAKOND AKY
21
code HC0048.01GB ed.B-1406
AKY
HC0047 C2 033
5.
INSTRUCTIONS TO THE INSTALLER
Instructions for installing and setting the boiler are intended for
authorized personnel only. Read safety rules first.
N.B.: The installer shall train the user on how to use the equipment
5.1. General Installation Rules
The boiler must be installed in compliance with existing laws
and regulations for the installation and maintenance of heating
equipment.
5.2. Transport and Handling
AKY boilers and indoor units are delivered in paperboard
packaging.
Unload the unit from truck and move it to the installation place
using a convenient system, suited to the weight of the load.
If the unit is stored at the customer’s premises, make sure a suit-
able place is chosen, sheltered from rain and excessive humidity.
Any lifting and transport operations must be accomplished by
skilled personnel, adequately trained on working procedures
and safety rules.
Materials resulting from unpacking shall be disposed of accord-
ing to relevant regulations.
While unpacking the unit, check its integrity and its compliance
to the order. Should damages or missing pieces result, imme-
diately inform the supplier.
T
he manufacturer is not liable for any damages occurred
during transport, handling, or unpacking.
5.3. Installation Accessories
Included with boilers:
•
1 paper template to install outdoor module.
•
2 0.5 m. hoses with each boiler (G1” for AKY050/070, G3/4"
for AKY032/034) and relevant gaskets;
•
1 90° plastic bend Ø60.
• 1 plastic flue terminal Ø60 L=400mm with hole for flue test.
•
1 gas cock (G3/4") with copper pipe and gaskets for gas
valve connection.
5.4. Boiler installation
We recommend installing the boiler in the lowest point of its
hydraulic circuit. This will prevent air bubble creation in the circuit.
5.4.1. Installation procedure for the boiler
•
Place drilling template on the wall and make sure it is cor-
rectly leveled. Drill two holes for fixing the boiler to the wall
and one hole for connections to outdoor unit.
•
Use screw anchors with outer M8 screw.
REMARK: Make sure the type of anchor you choose is
suitable for the type of wall and for the weight of the boiler.
(Anchors are not included.)
•
Hang the boiler and block it using locking washers.
•
Connect supplied flexible hoses to delivery and return fit
-
tings of the boiler. Use supplied gaskets and make sure
no foreign object enters the hoses.
Supplied hoses allow a maximum distance of 1 meter between
boiler fittings and indoor blower fittings.
N
ote: It is mandatory to install a Y filter on the boiler
water inlet to prevent clogging the heat exchanger.
If distance between boiler and blower is more than 1 meter, rigid
pipes of suitable diameter shall be used. Use supplied flexible
hoses (L=0.5m) to connect the boiler to rigid pipes.
For more information on head and flow rates, see the Technical
Data section and its charts of head/flow rate ratios.
The table on page 13 provides some indications on pipe diameter.
N
ote: During final phase of
the installation, make sure
the boiler has a backward incli-
nation. This will help drain the
condensate produced by flue
system.
To help this inclination, a shim
can be introduced in between
the bottom of the boiler and
the wall.
Содержание AQUAKOND AKY
Страница 2: ...CONDENSATION BOILER AQUAKOND AKY 2 code HC0048 01GB ed B 1406 AKY ...
Страница 4: ...CONDENSATION BOILER AQUAKOND AKY 4 code HC0048 01GB ed B 1406 AKY 3 7 Approval Certificate ...
Страница 5: ...CONDENSATION BOILER AQUAKOND AKY 5 code HC0048 01GB ed B 1406 AKY ...
Страница 44: ...CONDENSATION BOILER AQUAKOND AKY 44 code HC0048 01GB ed B 1406 AKY ...