Step 6
1.Place the
Bottom Guide[17]
onto the center of the
Bottom Rail [03]
and mark the hole
for drilling
(
Fig 10.1 and Fig 10.2). Drill a 1/8" hole at each marked location if drilling into
acrylic or wood material (Fig 10.3). Drill a 1/4" hole at each marked location if drilling into
tile material and insert the
Wall Plugs[14]
(Fig 10.4).
2.Fix the
Bottom Guide[17]
with
screws ST3.5X25[19]
(
Fig 10.5). Install
Bottom Guide Cap[18]
to finish the Bottom Guide‘s installation
(
Fig 10.6).
12
Fig10
Screw
ST3.5X25[19]
only use
wall
plugs with tile
bottom
guide
center
bottom rail
threshold
2
1
6
5
4
3
Содержание SD-FRLS05901 Series
Страница 26: ......