Anthony Lifgtates, Inc.
24
MRT Models
www.anthonyliftgates.com
800-482-0003
14. Make sure the power cut-off switch on the liftgate
battery box is in the Off position.
15. Route a ground cable (wire supplied with kit) through
the back of the power unit enclosure. Connect
one end to the pump body (A) and the other to the
ground terminal on the auxiliary batteries (B).
16. Connect one end of the battery supply cable (wire
supplied with kit) to the On/Off switch (C).
17. Connect the other end of the cable to the liftgate
batteries positive (+) post.
18. Route the long battery cable through the right side of
the battery box and connect it to the 200 Amp circuit
breaker.