
Step 3.
Follow the directions displayed on the screen to set-up and
connect the power meter to the VNA. Refer also to
Figure 6-2. Select START ALC CALIBRATION from the
menu.
Step 4.
Follow the directions displayed on the VNA screen until the
calibration is completed.
Step 5.
When Port 1 has been calibrated, connect the Power Sensor
to Port 2 and Calibrate Port 2.
RF POWER/ALC CALIBRATION
ADJUSTMENTS
6-12
37XXXD MM
7
8
9
4
5
6
1
2
3
0
.
-
Po
w
er Sensor
ANRITSU 3
7
XXXD
VNA
Dedicated GPIB
ANRITSU ML2
4
XXA
Po
w
er Meter
Figure 6-2.
Equipment Set-Up for RF Power/ALC Calibration
Содержание 37 D Series
Страница 3: ......
Страница 4: ......
Страница 12: ......
Страница 14: ...1 2 37XXXD MM Figure 1 1 Series 37XXXD Vector Network Analyzer System...
Страница 26: ......
Страница 35: ...REPLACEABLE PARTS PARTS ORDERING INFORMATION 37XXXD MM 2 9 2 10 Figure 2 2 Signal Source Parts Location Diagram...
Страница 36: ......
Страница 38: ......
Страница 62: ......
Страница 80: ......
Страница 82: ......
Страница 90: ......
Страница 104: ......
Страница 122: ......
Страница 143: ...REMOVE AND REPLACE SIGNAL SOURCE MODULES 37XXXD MM 8 23 Figure 8 11 Signal Source Module Assemblies Removal Details...
Страница 148: ......
Страница 152: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ...D 4 37XXXD MM ME7808 BLOCK DIAGRAM ME7808 BROADBAND SYSTEM MAINTENANCE Figure D 1 ME7808B C Block Diagram...
Страница 184: ......
Страница 190: ......