![Ankom ANKOM200 FIBER ANALYZER Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/ankom/ankom200-fiber-analyzer/ankom200-fiber-analyzer_operators-manual_2944715030.webp)
Operator’s Manual
pg. 30
Rev 1/24/20
Replacing the Fuse in a 120V instrument
To replace the fuse in a 120V ANKOM
200
Fiber Analyzer, follow the procedure detailed below.
1.
Turn off the instrument power and unplug the Power
Cord from the outlet.
2.
Using a flat blade screwdriver, twist the slot on the
fuse holders clockwise ¼ turn to open.
3.
Replace the 15 amp glass or ceramic fuse.
4.
Install the fuse in the fuse holder.
5.
Re-install the fuse holder into the instrument.
Reset/replace the Circuit Breaker in a 220V instrument
To reset/replace the circuit breaker in a 220V ANKOM
200
Fiber Analyzer, follow the procedure detailed below.
1.
Turn off the instrument power and unplug the Power
Cord from the outlet.
2.
Push the re-settable circuit breaker in.
3.
If the breaker will not reset, then replace it.
Cleaning the exterior of the instrument
Acid residue left on the exterior of the instrument can damage external electrical components. To clean the exterior of the
instrument, wipe the outside cabinet with a retail window cleaner.
Fuse
Re-settable
Circuit Breaker
Содержание ANKOM200 FIBER ANALYZER
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 6: ...Operator s Manual pg 6 Rev 1 24 20 This page intentionally left blank ...
Страница 12: ...Operator s Manual pg 12 Rev 1 24 20 This page intentionally left blank ...
Страница 18: ...Operator s Manual pg 18 Rev 1 24 20 This page intentionally left blank ...
Страница 28: ...Operator s Manual pg 28 Rev 1 24 20 This page intentionally left blank ...
Страница 36: ...Operator s Manual pg 36 Rev 1 24 20 Appendix A Wiring Diagram ...
Страница 37: ...Operator s Manual Rev 1 24 20 pg 37 This page intentionally left blank ...