13.2.2
Valve Bases
The 2 9 pin valve bases need to be installed – there is only one way for them to go in – the main
key is to be sure they are FLAT - we don’t want a tube leaning over later – best way to do this
like on the power supply is to use some tape to secure the valve base down – solder one leg
from underside of the board and then the leg on the opposite side – with these two legs
soldered remove the tape and make sure it is flat – if not flat then easy to correct at this point
by re applying heat to the solder joint and pushing on the valve base on the side that needs
some adjusting! Once you are satisfied then you can continue soldering the other legs!
Figure 54 - Valve Base Locations
74
Содержание DAC5.1 Signature
Страница 1: ...DAC5 1 Signature Construction Manual Version 2 0 Jan 2016 audionotekits rogers com 1 613 822 7188 ...
Страница 19: ...7 3 4 Connecting the Black wires Figure 5 Black Wires to PCB Followed by the Black wires 15 ...
Страница 20: ...7 3 5 Connecting the Black Grey wires Figure 6 Black Grey wires to PCB And finally the black grey wires 16 ...
Страница 31: ...Figure 16 Completed Filament Board 27 ...
Страница 34: ...Figure 19 Power Supply PCB Schematic 30 ...
Страница 46: ...42 ...
Страница 47: ...43 ...
Страница 49: ...45 ...
Страница 50: ...46 ...
Страница 51: ...47 ...
Страница 62: ...58 ...
Страница 72: ...Figure 49 Super Regulator Board to DAC Board 68 ...
Страница 80: ...Figure 56 Completed Line Stage Installed 76 ...
Страница 97: ...Figure 73 Installed Rotary Switch Outside Figure 74 Installed Rotary Switch Inside 93 ...
Страница 101: ...21 DAC5 1 Appendix 97 ...
Страница 102: ...98 ...
Страница 103: ...99 ...
Страница 104: ...100 ...