Commissioning
24
Edition 02.19
qTOWER
3
84 / qTOWER
3
84 G
6
Commissioning
Prior to commissioning, check that all requirements are fulfilled at the installation loca-
tion (see section "Installation conditions" p. 19).
6.1
Connections and control elements
1
Upper part with fluorescence-
spectrometer
2
Lock with handle
3
LED for status display
4
Lower part with thermal cycler
Fig. 3
qTOWER³ 84 front view
1
Heated lid
2
Sample block
3
Twistlock
Fig. 4
qTOWER³ 84, open