2015
43
Operation
7
Operation
7.1
Turning On (Readiness for Operation)
1.
Check
for
correct
connection
of
power
cord
to
line
power
supply.
2.
Check
that
all
front
doors
are
closed.
3.
Transfer
On/Off
switch
into
position
"I"
(
).
Fig.
13: On/Off switch
4.
Follow
instructions
and
advice
regarding
stand-by
mode
„Touch Sensor with LED” on page 27
.
5.
Watch
operating
state
indicator
(LED):
Green
(steady):
Reports
completion
of
init
routine
and
readiness
for
operation.
6.
Turn
PC
on
and
trigger
starting
routine.
The system is ready for action and to carry out commands of the computer
controller.
Содержание 845-00003-03
Страница 1: ...InnuPure C96 User Manual ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...2015 VII ...
Страница 8: ...VIII 2015 ...
Страница 12: ...XII 2015 ...
Страница 20: ...8 2015 General Information ...
Страница 44: ...32 2015 Technical Description ...
Страница 54: ...42 2015 Routine Start Up Procedure ...
Страница 60: ...48 2015 Operation ...
Страница 64: ...52 2015 What to do if ...
Страница 72: ...60 2015 Shutting Down ...
Страница 76: ...64 2015 Waste Disposal ...