2015
17
Safety
Notes
3.8
Safety Notes for Operation
3.8.1
General Advice
Operating
personnel
are
obliged
to
convince
themselves
of
the
proper
technical
condition
of
the
system
and
its
components,
including
that
of
safety
devices,
before
they
can
proceed
to
action
for
powering
up.
Notably,
this
requirement
applies
following
a
change
in,
an
extension
to
or
a
repair
of
the
system.
Do
not
operate
the
system,
unless
all
protective
devices
are
in
place,
properly
installed
and
fully
functional.
Protection
and
safety
devices
must
not
be
removed,
altered
or
defeated
during
normal
operation.
Ensure
easy
access
to
the
main
power
switch,
as
well
as
emergency
shutdown
and
locking
points
at
any
time
during
system
operation.
Take
care
that
all
ventilation
devices
of
the
system
are
in
a
properly
functioning
condition.
Obstructed
ventilation
grids,
air
inlet/outlet
slits,
etc.
may
result
in
malfunction
or
system
damage.
Operating
personnel
are
required
to
immediately
notify
the
owner
of
any
change
identified
in
the
system
and
likely
or
known
to
impact
the
level
of
safety.
3.8.2
Explosion Proofness, Fire Prevention
The
system
must
not
be
operated
in
an
explosive
environment
or
using
explosive
substances.
Operating
personnel
must
be
duly
informed
about
the
locations
and
the
proper
handling
of
fire-extinguishing
equipment
in
the
operating
room.
3.8.3
Electrical
Work
on
electrical
and
electronic
parts
of
the
system
and
its
components
may
only
be
carried
out
by
a
suitably
qualified
electrician
and
in
accordance
with
latest
binding
electrical
regulations.
Refrain
from
start-up
action
of
any
kind
if
cables
are
damaged
(e.g.
cuts
in
cabling,
worn
or
chafed
places)!
Observe
prescribed
maintenance
intervals
(
„Maintenance & Care” on page 53
).
The
main
power
plug
includes
a
ground
(PE)
contact
that
may
only
be
connected
to
a
socket
with
ground
(PE)
contact.
The
PE
conductor
may
not
be
interrupted
(e.g.
through
the
use
of
a
voltage
regulating
transformer).
Do
not
use
extension
cables
without
a
PE
conductor!
Power
cabling
must
be
installed
in
a
workmanlike
manner!
To
detach
a
power
cable
from
the
mains
socket,
always
hold
it
by
the
plug.
Under
no
circumstances
may
system
shielding
be
removed.
There
is
life-threatening
danger
due
to
electrical
shock
if
shielding
parts
are
removed!
Do
not
insert
objects
into
a
system
opening
and
make
sure
that
no
liquid
can
penetrate
through
openings
or
joints
into
the
inner
system
space.
The
main
fuse
prevents
danger
of
fire
from
electrical
overload
situations.
Do
not
short
this
fuse
and
use
only
a
line
fuse
of
the
type
specified
in
this
User
Manual
for
replacement.
Содержание 845-00003-03
Страница 1: ...InnuPure C96 User Manual ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...2015 VII ...
Страница 8: ...VIII 2015 ...
Страница 12: ...XII 2015 ...
Страница 20: ...8 2015 General Information ...
Страница 44: ...32 2015 Technical Description ...
Страница 54: ...42 2015 Routine Start Up Procedure ...
Страница 60: ...48 2015 Operation ...
Страница 64: ...52 2015 What to do if ...
Страница 72: ...60 2015 Shutting Down ...
Страница 76: ...64 2015 Waste Disposal ...