Installation and Setup
25
Instruction Manual – HDMI-UTPRO-0808
Reliable Earthing (Grounding)
Reliable earthing of rack-mounted equipment should be maintained. If not using a direct connection to the branch circuit
(e.g., plugging into a power strip), pay particular attention to supply connections.
Unpacking
The HDMI-UTPRO-0808 Kit is shipped in two boxes (one contains the HDMI UTPro and the other contains the
HDMI-UTPRO-RX units). The invoice is sent separately; a packing slip is attached to the outside of each box.
The complete kit includes following items:
HDMI-UTPRO-0808 Kit (enclosure, 8 receivers, 8 desktop power supplies)
Standard US power cord (if shipped within the US)
Rack ears with 8 screws per kit
Other enclosure products as needed
The documentation includes:
AMX HDMI-UTPRO-0808, Twisted Pair Dist Kit Quick Start Guide
Shipping boxes are marked as “Box __ of __,” where the first blank is the box number and the second blank is the total
number of boxes in the shipment.
Unpacking Tips
Before fully unpacking the enclosure,
inspect the shipping box for any signs of damage
.
If a box is partially crushed or any sides have been broken open, notify the shipping agency immediately and
contact your AMX representative (see the warranty at www.amx.com).
Once unpacking is complete, closely check the physical condition of the enclosure.
Collect all documentation.
Note:
Please save the original shipping container and packing materials. AMX is not responsible for damage
caused by insufficient packing during return shipment to the factory. Shipping boxes are available; contact
your AMX representative for details.
Caution:
We recommend attaching all power cords to a surge protector and/or an AC line conditioner.