![Amsco 36 H Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/amsco/36-h/36-h_operators-manual_2936188018.webp)
1-4
P129394-068
Operator Manual
Safety Precautions
Insufficient service clearance will make repairs more difficult and time-consuming.
Piping sized too small may cause water hammer, resulting in damage to the sterilizer.
After installation, it is mandatory to brace piping at the drain funnel so that it will not move vertically.
Make sure door opening is clear of any obstruction before closing the door(s).
Do not attempt to open sterilizer door during manual operation unless chamber is at 0 psig.
During manual operation, gasket must be fully retracted prior to operating sterilizer door.
Immediately wipe up saline solution spills on loading car, to prevent damage to stainless steel.
!
!
!
!
!
!
!
Содержание 36 H
Страница 2: ......
Страница 14: ...xii P129394 068 Operator Manual Techniques of Sterilization LIST OF FIGURES Descrption Page ...
Страница 59: ...6 11 Sterilizer Operation Operator Manual P129394 068 Healthcare Capital Equipment ...
Страница 63: ...6 15 Sterilizer Operation Operator Manual P129394 068 Healthcare Capital Equipment ...
Страница 66: ...6 18 P129394 068 Operator Manual Sterilizer Operation Figure 6 9 Typical Printout of a Liquid Cycle ...
Страница 67: ...6 19 Sterilizer Operation Operator Manual P129394 068 Healthcare Capital Equipment ...
Страница 78: ...6 30 P129394 068 Operator Manual Sterilizer Operation Healthcare Capital Equipment ...
Страница 116: ...8 10 P129394 068 Operator Manual Routine Maintenance Healthcare Capital Equipment ...
Страница 140: ...9 24 P129394 068 Operator Manual Troubleshooting Healthcare Capital Equipment ...
Страница 152: ...10 12 P129394 068 Operator Manual Service Procedures Healthcare Capital Equipment ...