GASGUARD IS CONTROLLER Issue: R2, Date: 26/09/2011, CRN: 7502
Page 7
1.
Receiving and Storage
1.1
Receiving
All possible precautions are taken to protect the Gasguard controller against damage or losses during shipment,
however before accepting delivery, check all items against the packing list or Bill of Lading. If there are shortages or
evidence of physical damage, notify Ampcontrol immediately.
Notify Ampcontrol within 7 days (maximum) in case of shortages or discrepancies, according to the packing list. This
action will help ensure a speedy resolution to any perceived problems. Keep a record of all claims and
correspondence. Photographs are recommended.
Where practicable do not remove protective covers prior to installation unless there are indications of damage.
Boxes opened for inspection and inventory should be carefully repacked to ensure protection of the contents or else
the parts should be packaged and stored in a safe place. Examine all packing boxes, wrappings and covers for
items attached to them, especially if the wrappings are to be discarded.
1.2
Storage after Delivery
Where equipment is not to be installed immediately, proper storage is important to ensure protection of equipment
and validity of warranty.
All equipment should be stored indoors protected from the elements in a cool dry area. If storing on the ground,
ensure that the storage area is not an area where water will collect.
1.3
Unpacking of Equipment
The method of packing used will depend on the size and quantity of the equipment.
Take care when unpacking the Controller to avoid damaging its enclosure or display window.
The disposal of packaging materials, replaced parts, or components must comply with
environmental restrictions without polluting the soil, air or water.
Ensure that any timber and cardboard used as packaging is disposed of in a safe and
environmentally responsible manner.
Where possible, dispose of all waste products i.e. oils, metals, plastic and rubber products
by using an approved recycling service centre.
Содержание gasguard
Страница 46: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 45 10 2 Modbus Memory Map Part 2 ...
Страница 47: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 46 ...
Страница 49: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 48 A2 Top Level Functional Block Diagram ...
Страница 50: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 49 A3 Input Channel Functional Block Diagram ...
Страница 51: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 50 A4 Zoning Functional Block Diagram ...
Страница 52: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 51 A5 Relay Functional Block Diagram ...
Страница 53: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 52 A6 Current Follower Outputs Performance Graph ...
Страница 62: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 61 B2 Main Menu Flowchart ...
Страница 63: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 62 B3 Calibration Flowchart ...
Страница 64: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 63 B4 Configuration Flowchart ...
Страница 65: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 64 Configuration Flowchart con t ...
Страница 66: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 65 Configuration Flowchart con t ...
Страница 74: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 73 Appendix C Approvals ...
Страница 75: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 74 ...
Страница 76: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 75 ...
Страница 77: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 76 ...
Страница 78: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 77 ...
Страница 79: ...GASGUARD IS CONTROLLER Issue R2 Date 26 09 2011 CRN 7502 Page 78 ...