7
5. Open the carton of parts and check the parts according to parts box list
(See Fig. 10).
D. Position powerside columns
Lay down two columns on the installation site parallelly, position the powerside
column according to the actual installation site. Usually, it is suggested to install
powerside column on the front-right side from which vehicles are driven to the lift
(See Fig. 11).
Fig. 11
E. Connecting the cables
Car in Direction
Powerside column
Offside column
Assemble top-plate
using M10*35 hex
bolt with nut and lock
washer
Fig. 10
Содержание 209X
Страница 1: ...TWO POST LIFT Model BP 9X...
Страница 4: ...2 MODEL 209X SPECIFICATIONS 3 1 2 12 1 2...
Страница 5: ...3 Fig 2 For Model 209X 100 3 4 28 50 5 8 28 50 5 8...
Страница 12: ...10 H Lift the carriages up by hand and make them be locked at the same level See Fig 17 Fig 17...
Страница 14: ...12 K Install hydraulic power unit and oil hose assy See Fig 20 Fig 19 71 68 71A 71 69A 70 71 69 71...
Страница 19: ...17 Terminal 3 of control button is connected with terminals L1of AC contactor Fig 27 Single phase...
Страница 20: ...18 IV EXPLODED VIEW Model BP 9X Fig 28 Car in direction...
Страница 21: ...19 Cylinders MANUAL POWER UNIT 220V 60Hz 1Phase Fig 30 Fig 29...