4
II. INSTALLATION REQUIREMENT
A.
TOOLS REQUIRED
✓
Rotary Hammer Drill (Φ19)
✓
Hammer
✓
Level Bar
✓
English Spanner (12")
✓
Ratchet Spanner With Socket (28
#
)
Wrench set
✓
Carpenter’s Chalk
✓
Screw Sets
✓
Tape Measure (7.5m)
✓
Pliers
✓
Socket Head Wrench (6
#
)
Lock Wrench
(10
#
, 13
#
, 14
#
, 15
#
, 17
#
, 19
#
, 24
#
, 27
#
)
Fig. 3
Содержание 209X
Страница 1: ...TWO POST LIFT Model BP 9X...
Страница 4: ...2 MODEL 209X SPECIFICATIONS 3 1 2 12 1 2...
Страница 5: ...3 Fig 2 For Model 209X 100 3 4 28 50 5 8 28 50 5 8...
Страница 12: ...10 H Lift the carriages up by hand and make them be locked at the same level See Fig 17 Fig 17...
Страница 14: ...12 K Install hydraulic power unit and oil hose assy See Fig 20 Fig 19 71 68 71A 71 69A 70 71 69 71...
Страница 19: ...17 Terminal 3 of control button is connected with terminals L1of AC contactor Fig 27 Single phase...
Страница 20: ...18 IV EXPLODED VIEW Model BP 9X Fig 28 Car in direction...
Страница 21: ...19 Cylinders MANUAL POWER UNIT 220V 60Hz 1Phase Fig 30 Fig 29...