
Versitron Operation Manual
35
5.16
User Interface (UI) Control Unit
Before proceeding the operator should be familiar with the basic test operation and
scale changing. See previous sections for directions on these functions.
5.17
Installation
For proper installation instructions of the U.I. Control Unit, refer to section 4.5 of the
manual.
5.18
Powering Up
Power up the Control Unit from the power switch located on the back of the console.
When the Control Unit is powered up, the initial “splash screen” first flash the Ametek
logo, followed by the Newage hardness testing logo, along with the firmware version
and the machine serial number.