vi
3050-AP Moisture Analyzer
Safety Notes
WARNINGS, CAUTIONS, and NOTES contained in this manual emphasize critical instruc-
tions as follows:
AN OPERATING PROCEDURE WHICH, IF NOT STRICTLY OBSERVED, MAY
RESULT IN PERSONAL INJURY OR ENVIRONMENTAL CONTAMINATION.
AN OPERATING PROCEDURE WHICH, IF NOT STRICTLY OBSERVED, MAY
RESULT IN DAMAGE TO THE EQUIPMENT.
IMPORTANT INFORMATION THAT SHOULD NOT BE OVERLOOKED.
READ THIS MANUAL BEFORE BEGINNING THE INSTALLATION AND
OPERATION OF THE 3050-AP ANALYZER SYSTEM. FAILURE TO DO SO,
AND OR USE OF THE EQUIPMENT IN A MANNER NOT SPECIFIED IN THIS
MANUAL OR ACCOMPANYING DOCUMENTS, MAY IMPAIR THE PROTEC-
TION AGAINST FIRE, ELECTRICAL SHOCK AND INJURY ORIGINALLY
PROVIDED BY THIS EQUIPMENT. IN ADDITION, FAILURE TO FOLLOW
THE INSTALLATION AND START-UP INSTRUCTIONS MAY VOID THE IN-
STRUMENT WARRANTY.
“Read and adhere to this warning when explosion proof housing is in use:
WARNING - Before removing cover, turn off all air and sample lines to isolate
analyzer from process and wait 5 minutes for pressuresto bleed down. Diffi
culty turning cover could indicate pressure build-up inside enclosure due to
extraordinary
conditions.
Electrical Safety
Up to 240Vac may be present in the analyzer housings. Always shut down power source(s)
before performing maintenance or troubleshooting. Only a qualified electrician should make
electrical connections and ground checks.
Grounding
Instrument grounding is mandatory. Performance specifications and safety protection are void
if instrument is operated from an improperly grounded power source.
VERIFY GROUND CONTINUITY OF ALL EQUIPMENT BEFORE APPLYING
POWER.
NOTE
!
WARNING
!
CAUTION
!
WARNING
!
WARNING
!
WARNING
Содержание 3050-AP
Страница 10: ...x 3050 AP Moisture Analyzer This page intentionally left blank...
Страница 19: ...Instalation and Startup 2 3 Figure 2 1 Model 3050 AP front and side view...
Страница 20: ...2 4 3050 AP Moisture Analyzer Figure 2 2 Model 3050 AP rear view...
Страница 24: ...2 8 3050 AP Moisture Analyzer Figure 2 5 3050 AP Power and Signal Connections...
Страница 25: ...Instalation and Startup 2 9 Figure 2 6 4 20 mA Output Wiring...
Страница 26: ...2 10 3050 AP Moisture Analyzer Figure 2 7 RS 232 Wiring...
Страница 27: ...Instalation and Startup 2 11 Figure 2 8 RS 485 Cables Multiple 3050 OLV s...
Страница 28: ...2 12 3050 AP Moisture Analyzer Figure 2 9 RS 485 to RS 232 Conversion for host PC...
Страница 46: ...5 4 3050 AP Moisture Analyzer This page intentionally left blank...