Instalation and Startup 2-7
Electrical Connections
1. Remove terminal cover.
2. Connect the 4 to 20 mA analog output and alarm contacts from the analyzer to user
recording equipment. Refer to figure 2.5 and figure 2.6.
3. Connect RS-232 or RS-485 serial communication from analyzer to the PC being used for
customer parameter setup. Refer to figures 2.7 through 2.9.
4. Insert the RS-485 termination plug into the RS-485 out connection if communicating
with one analyzer or the last in a chain. Refer to figure 2.8.
5. Connect 24Vdc power to analyzer.
Figure 2.4: Dryer Installation
Содержание 3050-AP
Страница 10: ...x 3050 AP Moisture Analyzer This page intentionally left blank...
Страница 19: ...Instalation and Startup 2 3 Figure 2 1 Model 3050 AP front and side view...
Страница 20: ...2 4 3050 AP Moisture Analyzer Figure 2 2 Model 3050 AP rear view...
Страница 24: ...2 8 3050 AP Moisture Analyzer Figure 2 5 3050 AP Power and Signal Connections...
Страница 25: ...Instalation and Startup 2 9 Figure 2 6 4 20 mA Output Wiring...
Страница 26: ...2 10 3050 AP Moisture Analyzer Figure 2 7 RS 232 Wiring...
Страница 27: ...Instalation and Startup 2 11 Figure 2 8 RS 485 Cables Multiple 3050 OLV s...
Страница 28: ...2 12 3050 AP Moisture Analyzer Figure 2 9 RS 485 to RS 232 Conversion for host PC...
Страница 46: ...5 4 3050 AP Moisture Analyzer This page intentionally left blank...