
48
d. Open main door. The dryer
must stop
and
ALL
output indicator lights on the back side of the micro-
processor (computer) board
must go out
. (Refer to the
illustration
on
previous page
[
page 46
].)
e. Try to restart the dryer with the main door open.
f. The microprocessor (computer) board's L.E.D. display
must read
"
DOOR
."
g. Close the main door and restart the dryer.
h. Functional check of microprocessor (computer) board is complete
.
a. Upon completing installation of the
replacement Hot Surface Ignition (HSI)
module, reestablish power to the dryer.
b. The HSI module's "red" indicator light
will light up for approximately 5
seconds (self check routine).
If the HSI module's "red" indicator light
stays on or flashes continuously, then the
HSI module is wired incorrectly or has failed.
c. Start the drying cycle.
d. The hot surface ignitor will turn on. After approximately 4 seconds the glo-bar will shut off and the gas
valve will be energized.
The flame should now be established.
e. With the burner flame on, remove the flame sensor wire from the S2 terminal of the HSI module.
The
burner flame must shut off immediately.
f. Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.
g. The hot surface ignitor will turn on and after approximately 4 seconds the hot surface ignitor will shut off.
The gas valve will be energized and a burner flame
should be
evident for approximately 7 seconds and
then shut off.
h. The HSI module will attempt two (2) additional ignition trials after which the HSI module will lock out and
the "red" indicator light
will flash continuously.
i. Functional check of the Hot Surface Ignition (HSI) Module is complete.
1) Replace the flame sensor wire from the S2 terminal to the HSI module.
2. Hot Surface Ignition (HSI) System
Содержание ML-75HS
Страница 22: ...18 ...