
35
5. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI, steam damper
operation
must be
checked before the dryer is put into operation. Refer to
page 33
for instructions to check
steam damper operation. If steam damper adjustment is necessary, locate the flow control valve and make the
necessary adjustments as noted below.
Содержание ML-75HS
Страница 22: ...18 ...