32
NOTE:
Water column (W.C.) pressure requirements (measured at the gas valve pressure tap from the
manifold side of the gas valve):
Natural Gas ................................. 3.5 Inches (8.7 mb) water column.
Liquid Propane (L.P.) Gas ............ 10.5 Inches (26.1 mb) water column.
IMPORTANT:
There is no regulator provided in an L.P. dryer. The water column pressure
must be
regulated at the source (L.P. tank) or an external regulator
must be
added to each
dryer.
4. Make a complete operational check of
ALL
safety related circuits (i.e., lint basket switches and sail
switches).
NOTE:
The sail switch can be checked for proper operation by opening the main door, and while
holding the main door switch in, start the dryer. The heating units should not come on. If it
does, make the necessary adjustments.
5. Each basket (tumbler)
should be
operated through one (1) complete cycle to assure that no further
adjustments are necessary and that
ALL
components are functioning properly.
BASKET (TUMBLER) COATING
The basket (tumbler) is treated with a protective coating. We suggest dampening old garments or cloth material
with a solution of water and nonflammable mild detergent and tumbling them in the basket (tumbler) to remove
this coating.
NOTE:
Drying and cooling cycles are complete when the light emitting diode (L.E.D.) display reads
“donE.”
6. Computer Programs/Selections
Each microprocessor controller (computer) has been preprogrammed by the factory with the most
commonly used program (parameter) selections. If microprocessor controller (computer) program changes
are required, refer to the Microprocessor Controller (Computer) Programming Manual
which was shipped
with the dryer.