
Construction and function of the sprayer boom
90
UF02 BAG00225.3 09.22
Working with the sprayer boom folded out on one side
Working with the sprayer boom only folded out on one side is only
permissible
with the swing compensation locked.
only if the other boom is folded down as a package from the
transport position (Super S boom).
briefly for passing obstacles (trees, electricity pylons, etc.).
Lock the swing compensation before folding up the sprayer
boom on one side.
If the swing compensation is not locked, the sprayer boom may
swing off to one side. If the folded-up boom strikes the ground,
this may cause damage to the sprayer boom.
Use a significantly reduced speed for spraying operation to avoid
the sprayer boom swinging out and coming into contact with the
ground with the swing compensation locked. Unless the sprayer
boom is guided smoothly, even lateral distribution cannot be
guaranteed.
Setting the spraying height
WARNING
Risk of crushing and impact for personnel who are caught while
the height of the sprayer boom is being raised or lowered.
Direct people out of the danger area of the machine before raising or
lowering the sprayer boom using height adjustment.
1. Direct people out of the danger area of the machine.
2. Set the spraying height in accordance with the spray table via
the
tractor control unit
yellow
,
Control terminal (with Profi-folding).
Always align the sprayer boom parallel to the ground; only then can
the specified spraying height be achieved on all nozzles.
Содержание UF 1002
Страница 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Страница 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Страница 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Страница 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Страница 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Страница 223: ...Spray table UF02 BAG00225 3 09 22 223...
Страница 232: ......