
Cleaning, maintenance and repairs
202
UF02 BAG00225.3 09.22
14.9.3 Checking and replacing the suction and pressure-side valves
Pay attention to the respective installation positions of the valves
on the suction and pressure sides before removing the valve
groups (5).
When reassembling, ensure that the valve guide (9) is not dam-
aged. Damage may cause the valves to jam.
Always tighten the screws (1) in a crosswise fashion using the
specified torque. Improper tightening of the screws causes warp-
ing, which results in leaks.
1. If necessary, remove the pump.
2. Remove the nuts (1,2).
3. Remove the suction and pressure port (3 and 4).
4. Remove the valve groups (5).
5. Check the valve seat (6), valve (7), valve spring (/8) and valve
guide (9) for wear or damage.
6. Remove the O-ring (10).
7. Replace defective parts.
8. After testing and cleaning, fit the valve groups (5).
9. Insert new O-rings (10).
10. Mount the suction (3) and pressure port (4) on the pump hous-
ing.
11. Tighten the nuts (1,2) in a crosswise fashion using a torque of
25
Nm (BP 160-185) / 20 Nm (AR 250-280)
.
Содержание UF 1002
Страница 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Страница 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Страница 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Страница 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Страница 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Страница 223: ...Spray table UF02 BAG00225 3 09 22 223...
Страница 232: ......