
Construction
and function of the sprayer boom
UF02 BAG00225.3 09.22
105
6.8 Spray
lines
Spray lines with part-width section valves
Spray lines with part-width section valves and DUS pressure circulation system
Spray lines with single nozzle control and DUS Pro pressure circulation system
(1) Flow meter
(2) Flow meter
(3) Boom part width section valves
(4) Bypass valve for low application rates
(5) Pressure circulation line
(6) DUS stop tap
(7) Pressure control valve
(8) Check valve
(9) Pressure control valve
Содержание UF 1002
Страница 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Страница 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Страница 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Страница 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Страница 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Страница 223: ...Spray table UF02 BAG00225 3 09 22 223...
Страница 232: ......