As it is difficult to dispose of residues in an environmentally-
friendly manner, carefully calculate the required filling quantity or
re-fill quantity to avoid leaving any residue at the end of spraying
operation.
To calculate the required re-fill quantity for topping up the
spray liquid tank, use the "Filling table for remaining spray
area". To do this, subtract the technical, undiluted residue
in the sprayer boom from the calculated re-fill quantity.
Refer to the section "Filling table for remaining areas"
Procedure
1. Determine the required water and agent spray rate by consulting
the directions for use for the crop protection agent.
2. Calculate the filling quantity or re-fill quantity for the area to be
treated.
3. Fill the machine and blend in the agent.
4. Agitate the spray liquid before commencing spraying operation,
in accordance with the instructions of the spraying agent manu-
facturer.
Fill the machine preferably using a suction hose and blend in the
agent while filling.
The induction area is thereby flushed with water constantly.
During the filling process, start blending in the agent once the
tank filling level has reached more than 20%.
When using more than one agent:
Clean the canister immediately after each induction of an
agent.
Flush the induction port after each induction of an agent.
When filling, no foam must escape from the spray liquid tank.
The addition of a froth-inhibiting agent also prevents the spray
liquid tank from frothing over.
The agitators normally remain switched on from the initial filling to the
end of the spraying operation. The instructions of the agent manufac-
turer, however, have priority.
Содержание UF 1002
Страница 20: ...General safety instructions 20 UF02 BAG00225 3 09 22 Super S boom...
Страница 21: ...General safety instructions UF02 BAG00225 3 09 22 21 Q Plus boom...
Страница 217: ...Liquid circuit UF02 BAG00225 3 09 22 217 Part width section control...
Страница 218: ...Liquid circuit 218 UF02 BAG00225 3 09 22 Single nozzle control Flushing water pump...
Страница 219: ...Liquid circuit UF02 BAG00225 3 09 22 219 Single nozzle control FlowControl...
Страница 223: ...Spray table UF02 BAG00225 3 09 22 223...
Страница 232: ......