
CHAPTER 5: MAINTENANCE
STA SERIES AC CONTROLS
990-351
5-7
Power Transformer T1
1
Disconnect the transformer cable connector from AC Timer Main Board connector J17.
2
While supporting the transformer with one hand, remove the two screws and lock washers.
3
Install re-install the transformer by supporting it with one hand while attaching it to the side of
the card cage with two screws and lock washers.
4
Reconnect the transformer cable connector to AC Timer Main Board connector J17.
Power Transformer T2
1
Disconnect the transformer cable connector from AC Timer Main Board connector J19.
2
While supporting the transformer with one hand, remove the two screws and internal tooth lock
washers.
3
Install or re-install the transformer by supporting it with one hand while attaching it to the side
of the card cage with the two screws and internal tooth lock washers.
4
Reconnect the transformer cable connector to AC Timer Main Board connector J19.
Valve Transformer, T3
1
Remove the following four wires from the transformer terminals: H1 (yellow), H4 (orange and
gray), XF (red), and X2 (black).
2
While supporting the transformer, remove the four 10-32 x 3/8 Phillips head screws, #10 split
lock washers, and #10 flat washers that secure the transformer to the Control and remove it.
3
Install or re-install the transformer with four 10-32 x 3/8 Phillips head screws, #10 split lock
washers, and #10 flat washers.
NOTE:
If you are installing a new transformer, be sure to reconnect the jumper(s) in the same
configuration as previously connected. See the
Wiring Diagram
on page 5-4 for specific
connections for different voltage inputs.
4
Connect the following wires to the indicated terminals and tighten the screws: yellow to H1,
orange and gray to H4, red to XF, and black to X2. Be sure to install the proper fuse, as shown
in
Section V, Parts List
.
Surge Resistors
1
To replace a surge resistor assembly, disconnect the violet wire from the SCR and the gray wire
from Valve Transformer terminal H4.
2
Remove the four screws and lock washers that attach the surge resistor assembly to the Control.
3
Install or re-install the surge resistor assembly by attaching the assembly to the Control with
four screws and lock washers.
4
Reconnect the violet wire to the SCR and the gray wire to Valve Transformer terminal H4.
Snubber
Содержание Miyachi Unitek STA-100A
Страница 1: ...990 351 Rev H AC WELDER STA SERIES OPERATION MANUAL...
Страница 18: ...CHAPTER 1 DESCRIPTION STA SERIES AC CONTROLS 1 4 990 351 STA 100A Series Major Components Typical...
Страница 24: ......
Страница 28: ......
Страница 48: ......
Страница 64: ......
Страница 68: ...CHAPTER 5 MAINTENANCE STA SERIES AC CONTROLS 5 4 990 351...
Страница 78: ......
Страница 82: ...APPENDIX A TECHNICAL SPECIFICATIONS STA SERIES AC CONTROLS A 4 990 351 STA 200A AC Control Control...
Страница 86: ...APPENDIX B ELECTRICAL AND DATA CONNECTIONS STA SERIES AC CONTROLS B 4 990 351 Input Output Control Signals...
Страница 90: ......
Страница 96: ...APPENDIX D SYSTEM TIMING STA SERIES AC CONTROLS D 2 990 351 Continuous Seam Weld...
Страница 98: ...APPENDIX D SYSTEM TIMING STA SERIES AC CONTROLS D 4 990 351 Spot Welding...
Страница 102: ......
Страница 104: ......
Страница 108: ......
Страница 112: ......
Страница 140: ......
Страница 144: ......
Страница 154: ...AMADA MIYACHI AMERICA INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...