
CHAPTER 3: USING STA SERIES CONTROL FUNCTIONS
STA SERIES AC CONTROLS
3-2
990-351
Section II: Schedule Screen
The
SCHEDULE
screen consists of the following
settings shown on the right.
SCHEDULE # 01
SQD SQZ UP1 W1 DN1 CO UP2 W2 DN2 HLD OFF
00 00 00 00 00 00 00 00 00 00 00
060%
000%
CH=F1 FORCE=0150Lb
ElecValve=01
SCR=1
IMPULSE=01
COPY TO # 00 PLUS 00
SCR
1
VALVES
1 2 3 4
SCHEDULE #
-
The schedule number is programmable from
00
to
63
; the default is
00
on initial
operation. Changing the schedule number will automatically display that schedule on the screen.
Pressing the
PROGRAM/SAVE
pushbutton toggles between the
Program
and
Run
Modes. Placing the
system in the
Run Mode
automatically saves the currently displayed values for the schedule.
If any changes have been made in any data field,
the system will prevent the operator from
changing to a different schedule until the
changes have been accepted or rejected. The
operator will get the following message:
MODIFIED SCHEDULE NOT SAVED.
PRESSING THE PROGRAM/SAVE KEY SAVES
MODIFICATIONS, THEN PRESS DESIRED
SCREEN BUTTON AFTER SAVING.
OR PRESS PLUS OR MINUS KEY TO LOSE
MODIFICATIONS
Links
– If the schedule is part of a linked
sequence, the upper-right corner of the screen
will show the links as a set of three 2-digit
numbers.
1)
First number:
Previous
schedule
2)
Second number:
Current
schedule
being used (shown in brackets
< >
).
SCHEDULE # 01
07<03>05
SQD SQZ UP1 W1 DN1 CO UP2 W2 DN2 HLD OFF
00 00 00 00 00 00 00 00 00 00 00
60%
000%
CH=F1 FORCE=0150Lb
ElecValve=01
SCR=1
IMPULSE=01
COPY TO # 00 PLUS 00
SCR
1
VALVES
1 2 3 4
3)
Third number:
Subsequent
schedules in the link.
In the example shown above (
07<03>05
)
,
07
is the previous schedule used,
03
is the current schedule
being used, and
05
will be the next schedule used. If the current schedule is the
first
of the link, the first
2-digits will be “
– –
“. Similarly, if it is the last of the link, the last 2-digits will be “
– –
“.
NOTE:
Each of the following weld sequence settings are programmable from
00
to
99
cycles. The
default is
00
for all values except
W1
and
W2
, whose defaults are
01
.
SQD
– Squeeze delay is that period between receipt of the start signal (FS1 or FS1/FS2) and the start of
the SQZ (squeeze) time. It allows the electrodes to move to the parts and build up force.
SQZ
– The squeeze time is the delay from the receipt of the start signal (or the end of SQD) until UP
times begin (weld power is not necessarily applied). It allows the system to settle and any mechanical
motion or ringing to stop before welding begins.
UP1
–
This is the upslope time for weld 1 of the sequence.
W1
– This is the weld 1 time of the sequence.
Содержание Miyachi Unitek STA-100A
Страница 1: ...990 351 Rev H AC WELDER STA SERIES OPERATION MANUAL...
Страница 18: ...CHAPTER 1 DESCRIPTION STA SERIES AC CONTROLS 1 4 990 351 STA 100A Series Major Components Typical...
Страница 24: ......
Страница 28: ......
Страница 48: ......
Страница 64: ......
Страница 68: ...CHAPTER 5 MAINTENANCE STA SERIES AC CONTROLS 5 4 990 351...
Страница 78: ......
Страница 82: ...APPENDIX A TECHNICAL SPECIFICATIONS STA SERIES AC CONTROLS A 4 990 351 STA 200A AC Control Control...
Страница 86: ...APPENDIX B ELECTRICAL AND DATA CONNECTIONS STA SERIES AC CONTROLS B 4 990 351 Input Output Control Signals...
Страница 90: ......
Страница 96: ...APPENDIX D SYSTEM TIMING STA SERIES AC CONTROLS D 2 990 351 Continuous Seam Weld...
Страница 98: ...APPENDIX D SYSTEM TIMING STA SERIES AC CONTROLS D 4 990 351 Spot Welding...
Страница 102: ......
Страница 104: ......
Страница 108: ......
Страница 112: ......
Страница 140: ......
Страница 144: ......
Страница 154: ...AMADA MIYACHI AMERICA INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...