38
Barge Board Installation
19
With the felt folded over the gable
ends and nailed down you can
install the barge boards. These
should be fitted flush with the top of
the roof and eaves (diagram 92). Fix
in place with 40mm Pan head
screws.
Diagram 91
Diagram 92
Dia. 92