26
Trims & Cloaking Installation
15
60m
m Sc
rew
Diagram 60
Diagram 61b
Diagram 62
Diagram 63
Now fit the top trim rail to the gable end, slot the top edge in first then roll the bottom in. Position
these tight up to the corner cloakings you just installed (diagram 61). The mitred end should line up
nicely with the corner of the softwood frame (diagram 62). These are fixed in place from the inside of
the building so you will need a helper to hold the trim in place while you do this. Fix through the
factory drilled holes in the tops of the side frames using 60mm countersunk screws (diagram 63).
Repeat this on the other
gable (Part: AB0528).
Dia. 61
Dia. 62
AB0527
AB0527
External
External
Internal
Diagram 61a
AB0527
Side Panel
Gable
Panel
Section
Содержание EVOLUTION FUSION
Страница 1: ...1 04 18...