14
Gable Installation
7
Now position the gable section (ABA0182) above the door. Line the
end of the bottom rail up with the outside of the softwood frame
on the side panel (diagram 26).
Make sure the internal surfaces
are flush before fixing.
Diagram 25
Diagram 28
Diagram 27
Dia. 26
Dia. 28
Drill pilot holes
and fix down with 60mm
countersunk screws (02-5110) shown
by the arrows below. It is correct for the
end of the gable to be out of alignment
with the side panel shown in diagram 28.
Repeat this for the rear gable.
ABA0182
ABA0182
ABA0
182
Internal
Diagram 26
External
FLUSH
Содержание EVOLUTION FUSION
Страница 1: ...1 04 18...