10
Side Assembly
4
Work your way around the building installing the panels as per the diagrams on page 8. When fixing
the panels make sure you pull them together tightly (you can even clamp them if that’s easier)
before fixing (diagram 17). On a straight jointed panel the internal surfaces should always be flush.
Its also important that the tops of the panels are level/flush.
Diagram 16
Diagram 17
Dia. 17
Internal
Содержание EVOLUTION FUSION
Страница 1: ...1 04 18...