
Neptune_GB_Ver.2.0_10/03
3.
Construction
Operator side
Display:
- Temperature setting
- Error message
- Running hours
- Sevice interval setting
Main switch S1:
Off / Cold / Hot
S1 main
switch
Detergent A/B valve
Data plate
Display board A2
Sealing
Sealing
The electric box
contains the control board, the transformer, relays, fuses and
connection terminals. The cover plate is mounted with the main switch, the display, the
temperature adjustment and five status / warning lights (Pic. 3.6).
The cover is sealed around the edge, the manometer and the detergent valve (Pic. 3.7).
.
(Pic. 3.8)
The cover is hinged in the lower left side and secured with a strap to avoid stress on the display
connection cable.
Adjust:
- Temperature setting
- Service intervals
12.
Operation
Fuel
Pump oil
Service
Anti Stone
Pic. 3.6:
Operator panel
Pic. 3.7:
Operator panel (backside)
Pic. 3.8:
Electrical box
Содержание Neptune 5
Страница 1: ...NEPTUNE 5 NEPTUNE 7 Service Manual...