508093-01
Issue 2033
Page 54 of 59
30.
Reinstall the cold end header box.
31.
Reinstall the combustion air inducer. Reconnect the
plug to the wire harness.
32.
Reinstall pressure switches and reconnect pressure
switch wiring.
33.
Carefully connect combustion air pressure switch
tubing from pressure switches to proper ports on cold
end header collector box.
34.
Reconnect condensate drain line to the cold end
header box.
35.
Use securing screws to reinstall flue collar to the top
cap on the furnace. Reconnect exhaust piping and
exhaust drain tubing.
36.
Replace flexible exhaust adapter on combustion air
inducer and flue collar. Secure using two existing hose
clamps.
37.
Reinstall burner box assembly in vestibule area.
Secure burner box assembly to vestibule panel using
four existing screws. Make sure burners line up in
center of burner ports
38.
Reconnect flame roll-out switch wires.
39.
Reconnect sensor wire and reconnect 2-pin plug from
ignitor.
40.
Reinstall gas valve manifold assembly. Reconnect gas
supply line to gas valve.
41.
Reconnect the combustion air intake pipe.
42.
Reinstall burner box cover.
43.
Reconnect wires to gas valve.
44.
Replace the blower compartment access panel.
45.
Reconnect gas supply piping. Turn on power and gas
supply to unit.
46.
Follow lighting instructions on unit nameplate to light
and operate furnace for 5 minutes to ensure the
furnace is operating properly.
47.
Check all piping connections, factory and field, for gas
leaks. Use a leak detecting solution or other preferred
means.
48.
Replace heating compartment access panel.
Some soaps used for leak detection are corrosive to
certain metals. Carefully rinse piping thoroughly after
leak test has been completed. Do not use matches,
candles, flame or other sources of ignition to check for
gas leaks.
CAUTION
Cleaning the Burner Assembly (if needed)
1.
Turn off electrical and gas power supplies to furnace.
Remove upper and lower furnace access panels.
2.
Disconnect the wires from the gas valve.
3.
Remove the burner box cover (if equipped).
4.
Disconnect the gas supply line from the gas valve.
Remove gas valve/manifold assembly.
5.
Mark and disconnect sensor wire from the sensor.
Disconnect wires from flame rollout switches.
6.
Disconnect combustion air intake pipe. It may be
necessary to cut the existing pipe to remove burner
box assembly.
7.
Remove four screws which secure burner box
assembly to vest panel. Remove burner box from the
unit.
8.
Use the soft brush attachment on a vacuum cleaner
to gently clean the face of the burners. Visually
inspect the inside of the burners and crossovers for
any blockage caused by foreign matter. Remove any
blockage.
9.
Reinstall the burner box assembly using the existing
four screws. Make sure that the burners line up in the
center of the burner ports.
10.
Reconnect the sensor wire and reconnect the 2-pin
plug to the ignitor wiring harness. Reconnect wires to
flame rollout switches.
11.
Reinstall the gas valve manifold assembly. Reconnect
the gas supply line to the gas valve. Reinstall the
burner box cover.
12.
Reconnect wires to gas valve.
13.
Replace the blower compartment access panel.
14.
Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
15.
Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
16.
Replace heating compartment access panel.