XS910/8 Unmanaged Switch Installation and User’s Guide
40
5. Verify that the POWER LED is green. If the LED is OFF, see Chapter
6, “Troubleshooting” on page 57.
The switch is now powered on and ready for network operations.
Warning
Disconnecting the Device: If the device becomes damaged or you
encounter abnormality with the device, disconnect the power plug
from the AC wall outlet immediately.
E100
Содержание XS910/8
Страница 1: ...613 003006 Rev A XS910 8 10 GIGABIT ETHERNET UNMANAGED SWITCH Installation and User s Guide...
Страница 10: ...XS910 8 Unmanaged Switch Installation and User s Guide 10...
Страница 24: ...XS910 8 Unmanaged Switch Installation and User s Guide 24...
Страница 45: ...Chapter 3 Installation Using the AT BRKT J24 Wall Mount Bracket 45 Figure 18 Installing the Switch on the Wall...
Страница 46: ...XS910 8 Unmanaged Switch Installation and User s Guide 46...
Страница 56: ...XS910 8 Unmanaged Switch Installation and User s Guide 56...
Страница 58: ...XS910 8 Unmanaged Switch Installation and User s Guide 58...
Страница 62: ...XS910 8 Unmanaged Switch Installation and User s Guide 62...