Chapter 2: Installation
31
Unpacking the Switch
To unpack the AT-XS910/8 switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the hardware components are included in your switch
package.
4. If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Table 5. Components in the Bracket Kit
Description
Item
AT-XS910/8
switch
AC power cord
Retaining Clip
Содержание XS910/8
Страница 1: ...613 003006 Rev A XS910 8 10 GIGABIT ETHERNET UNMANAGED SWITCH Installation and User s Guide...
Страница 10: ...XS910 8 Unmanaged Switch Installation and User s Guide 10...
Страница 24: ...XS910 8 Unmanaged Switch Installation and User s Guide 24...
Страница 45: ...Chapter 3 Installation Using the AT BRKT J24 Wall Mount Bracket 45 Figure 18 Installing the Switch on the Wall...
Страница 46: ...XS910 8 Unmanaged Switch Installation and User s Guide 46...
Страница 56: ...XS910 8 Unmanaged Switch Installation and User s Guide 56...
Страница 58: ...XS910 8 Unmanaged Switch Installation and User s Guide 58...
Страница 62: ...XS910 8 Unmanaged Switch Installation and User s Guide 62...