XS910/8 Unmanaged Switch Installation and User’s Guide
54
4. Turn the tray fixing screws on counter clockwise and pull out the tray.
See Figure 23.
You can draw the tray to a maximum of 250mm from the tray chassis.
x
Figure 23. Pulling out the AT-RKMT-J15 Tray
5. Place a switch in the tray and secure the switch to the tray with the
head screws through the holes on the slide rail weld. See Figure 24 on
Note
Install one switch at a time.
Содержание XS910/8
Страница 1: ...613 003006 Rev A XS910 8 10 GIGABIT ETHERNET UNMANAGED SWITCH Installation and User s Guide...
Страница 10: ...XS910 8 Unmanaged Switch Installation and User s Guide 10...
Страница 24: ...XS910 8 Unmanaged Switch Installation and User s Guide 24...
Страница 45: ...Chapter 3 Installation Using the AT BRKT J24 Wall Mount Bracket 45 Figure 18 Installing the Switch on the Wall...
Страница 46: ...XS910 8 Unmanaged Switch Installation and User s Guide 46...
Страница 56: ...XS910 8 Unmanaged Switch Installation and User s Guide 56...
Страница 58: ...XS910 8 Unmanaged Switch Installation and User s Guide 58...
Страница 62: ...XS910 8 Unmanaged Switch Installation and User s Guide 62...