25
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 26
“Selecting a Site and Planning the Installation” on page 29
“Unpacking the Switch” on page 31
“Installing the Switch on a Table or Desktop” on page 32
“Installing the Switch on a Wall” on page 34
“Installing the Switch in an Equipment Rack” on page 36
“Cabling the Switch” on page 37
Содержание XS910/8
Страница 1: ...613 003006 Rev A XS910 8 10 GIGABIT ETHERNET UNMANAGED SWITCH Installation and User s Guide...
Страница 10: ...XS910 8 Unmanaged Switch Installation and User s Guide 10...
Страница 24: ...XS910 8 Unmanaged Switch Installation and User s Guide 24...
Страница 45: ...Chapter 3 Installation Using the AT BRKT J24 Wall Mount Bracket 45 Figure 18 Installing the Switch on the Wall...
Страница 46: ...XS910 8 Unmanaged Switch Installation and User s Guide 46...
Страница 56: ...XS910 8 Unmanaged Switch Installation and User s Guide 56...
Страница 58: ...XS910 8 Unmanaged Switch Installation and User s Guide 58...
Страница 62: ...XS910 8 Unmanaged Switch Installation and User s Guide 62...