background image

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Steam Requirements

70420301 (EN)

50

Figure 22 

Table 11 

TMB2014N

NOTE: Refer to 

Table 11

 for sizing of steam lines. Piping must also be sized accordingly for length of runs,

and number of elbows.

1

Supply

8

18 in. (457 mm) Drop

2

12 in. (305 mm) Riser

9

Solenoid Valve (Supplied with machine)

3

Shut-Off Valve

10

Steam Bonnet

4

Condensate Return Line from Supply Line

11

Flexible Line

5

Return

12

Union

6

Check Valve

13

Trap with Built-In Strainer

7

Vacuum Breaker (Optional)

TMB2014N

2

12

6

3

5

1

13

10

9

8

6

7

4

11

Steam Pressure PSI (bar)

Minimum 

Supply Pipe Diameter

Steam Trap Size* 

(Pounds Condensate/Hour)

80 – 100 (5.3-6.9)

3/4 in. NPT

160

*Based on 100 psi.

Содержание YT050E

Страница 1: ...pacity 75 Pound Capacity Starting Serial No 0904004427 Refer to Page 5 for Model Identification TMB795C Part No 70420301ENR8 July 2012 Keep These Instructions for Future Reference If this machine chan...

Страница 2: ......

Страница 3: ...r smells gas These instructions must be posted in a prominent location Step by step instructions of the above safety information must be posted in a prominent location near the tumble dryer for custom...

Страница 4: ...e performed by a qualified installer Install tumble dryer according to manufacturer s instructions and local codes DO NOT install a tumble dryer with flexible plastic venting materials If flexible met...

Страница 5: ...stallation Inspection 17 Location Requirements 18 Position and Level the Tumble Dryer 19 Bolt On Angle Option 19 To Reverse the Loading Door 21 Before Placing Tumble Dryer into Service 24 Required for...

Страница 6: ...s 49 Thermal Oil Prep 49 Single Drop Timer 51 Power Up Mode 51 Ready Mode 51 Start Mode 51 Run Mode 51 Setting Dry Time Dipswitches 51 Resetting Cycle Time to Zero 51 Dipswitch Settings 52 Adjustments...

Страница 7: ...0S YT050T YU050S YU050T CT050E CU050E DR50E2 BT050E DR50E2 BU050E DR55E2 BT050E DR55E2 BU050E HT050E HU050E IPD50E2 IT050E ST050E SU050E UT050E UU050E YT050E YU050E 75 Pound CA075L CA075N CT075L CT075...

Страница 8: ...e coin KC single coin KW reversing prep for coin KX prep for coin KY prep for card KZ reversing prep for card LB reversing network adaptable coin LC network adaptable coin LW reversing network adaptab...

Страница 9: ...rial plate Serial Plate Location When calling or writing for information about your product be sure to mention model and serial numbers Model and serial numbers are found on serial plate on the rear o...

Страница 10: ...aring in this manual are not meant to cover all possible conditions and situations that may occur It must be understood that common sense caution and carefulness are factors which CANNOT be built into...

Страница 11: ...r of the tumble dryer and the exhaust duct should be cleaned periodically by qualified service personnel 15 If not installed operated and maintained in accordance with the manufacturer s instructions...

Страница 12: ...are dried wipe out the cylinder with a damp cloth to remove particles of fiberglass 26 Always follow the fabric care instructions supplied by the garment manufacturer 27 Never operate the tumble drye...

Страница 13: ...29 44 5 x 59 25 x 87 75 1130 x 1505 x 2229 Cylinder Size Inches mm 37 x 30 940 x 762 37 x 36 940 x 914 37 x 36 940 x 914 Cylinder Capacity dry weight Pounds kg 50 22 7 75 34 75 34 Air Outlet Diameter...

Страница 14: ...5 in 1378 mm 76 625 in 1946 mm 36 in 914 mm 38 625 in 981 mm 75 Pound Steam 30 75 in 781 mm 33 87 in 860 mm 54 25 in 1378 mm 80 in 2032 mm 36 in 914 mm 38 625 in 981 mm F75 Gas 30 75 in 781 mm 33 87 i...

Страница 15: ...ems LLC DO NOT COPY or TRANSMIT Specifications and Dimensions 13 70420301 EN Exhaust Outlet Locations TMB2238N A B C Models A B C 50 75 Pound 5 375 in 137 mm 8 in 203 mm 13 375 in 340 mm F75 6 5 in 16...

Страница 16: ...Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT Specifications and Dimensions 70420301 EN 14 Gas Connection Locations TMB2239N A B Diameter A B 75 1 2 in NPT 14 75 in 375 mm 65 75 in 1670 mm F75...

Страница 17: ...C DO NOT COPY or TRANSMIT Specifications and Dimensions 15 70420301 EN Electrical Connection Locations TMB2240N TMB82240N GAS AND STEAM ELECTRIC A A B B A B 3 25 in 83 mm 75 5 in 1918 mm NOTE These fi...

Страница 18: ...tems LLC DO NOT COPY or TRANSMIT Specifications and Dimensions 70420301 EN 16 Steam Connection Locations TMB2241N C A B D Models Diameter A B C D 50 75 Pound 3 4 in NPT 15 5 in 394 mm 78 25 in 1988 mm...

Страница 19: ...building codes water supply regulations electrical wiring regulations and any other relevant statutory regulations Due to varied requirements applicable local codes should be thoroughly understood and...

Страница 20: ...fficient clearance for servicing and operation refer to Figure 1 Figure 1 WARNING To reduce the risk of serious injury install lockable door s to prevent public access to rear of tumble dryers W055R1...

Страница 21: ...ure 2 Tumble dryer must not rock Lock leveling legs with nuts previously installed NOTE The front of the tumble dryer should be slightly higher than the rear approximately 0 125 inch 3 18 mm This will...

Страница 22: ...ical trunnion channels 12 Remove the junction contactor box Refer to Figure 4 13 Remove the exhaust thimble 14 The gas supply line may require removal if it extends past the rear panel If so disconnec...

Страница 23: ...nt it from dropping once side screws are removed from door hinge lug Figure 6 WARNING To reduce the risk of electric shock fire explosion serious injury or death Disconnect electric power to the tumbl...

Страница 24: ...adjustable pliers to remove plug and switch from front panel Reinstall switch orienting button toward center of machine Reinstall plug in switch s previous location Refer to Figure 7 Figure 7 7 Rerout...

Страница 25: ...anel Fully tighten bottom screws on front panel 11 Reinstall top screws and guide lugs 12 Adjust door catch if necessary to allow 7 15 pounds pull 0 48 1 03 bar at center of handle 13 Reinstall contro...

Страница 26: ...bleed air from the gas lines To reset open and close the loading door and restart tumble dryer If lockout condition persists check that the manual gas shut off valve is in the ON position and that the...

Страница 27: ...oleum L P Gas not regulated no governor Machines configured for Natural Gas regulator governor may be converted to L P Gas not regulated no governor with block open kit Part No M400763 Serial plates s...

Страница 28: ...9 2 3 M401017 N A L P Gas 3 28 37 No Governor 050 075 2 1 2 0 2 3 M401003 M400999 GB IE PT ES IT GR LU CH Natural Gas H 20 8 9 050 075 3 7 3 6 2 3 M401000 M401014 L P Gas 3 28 37 No Governor 050 075...

Страница 29: ...apply it to the serial plate over the ADJUSTED FOR ______ GAS ______ information 5 Commission tumble dryer for use Figure 11 Specific Conversion Procedures How to Convert Gas Valve from Regulated to U...

Страница 30: ...Figure 12 3 Install the new correct burner orifice s Refer to Figure 13 and Table 1 Torque each to 9 10 Nm 4 Reinstall spud holder assembly to gas valve making certain burner orifice s are in line wit...

Страница 31: ...from pressure tap 3 Connect a U tube manometer or similar pressure gauge to the burner orifice manifold pressure tap 4 Start tumble dryer and note pressure once flame is burning Remove regulator cap a...

Страница 32: ...joints do not permit the accumulation of lint DO NOT use plastic thin foil or Type B ducts rigid metal ducts are recommended Use exhaust ducts made of sheet metal or other noncombustible material DO...

Страница 33: ...t 2 4 m as required to meet UL2158 clause 7 3 2A Manifold Venting While it is preferable to exhaust tumble dryers individually to the outdoors a main collector duct may be used if it is sized accordin...

Страница 34: ...NOTE Inside of duct must be smooth Do not use sheet metal screws to join sections Consult your local building code for regulations which may also apply 1 Removable strip of panel in framing wall to pe...

Страница 35: ...al L K J I H G F E D C B A 3 1 2 ONE MANIFOLD ASSEMBLY Duct Station 50 75 Pound F75 8 in 203 mm Duct 10 in 254 mm Duct A 8 in 203 mm 10 in 254 mm B 12 in 305 mm 15 in 381 mm C 15 in 381 mm 18 in 457 m...

Страница 36: ...I L K J I CONTINUE TO A CONTINUE TO A TWO MANIFOLD ASSEMBLIES Duct Station 50 75 Pound F75 8 in 203 mm Duct 10 in 254 mm Duct A 13 in 330 mm 15 in 381 mm B 17 in 432 mm 22 in 559 mm C 18 in 457 mm 26...

Страница 37: ...al pipe size The following must be furnished and installed by the customer for the gas service line to each tumble dryer Refer to Figure 18 Sediment traps Shut off valves Supply pressure taps It is im...

Страница 38: ...the tumble dryers in the drying mode If burner does not light and unit goes into lockout open and close the door and restart Repeat these steps until burner ignites Use pipe compound resistant to act...

Страница 39: ...19 ft 5 8 m 75 pound tumble dryers 165 000 Btu hr each F75 pound tumble dryers 225 000 Btu hr each SAMPLE CALCULATIONS Equivalent length Total length of main gas supply pipe to the far end of the tum...

Страница 40: ...0 2 50 80 2 50 80 2 5 63 50 2 5 63 50 2 5 63 50 2 5 63 50 2 5 63 50 2 5 63 50 2 5 63 50 2 5 63 50 3 76 20 3 76 20 3 76 20 3 76 20 3 76 20 1 25 40 1 25 40 1 25 40 1 25 40 1 25 40 1 25 31 75 1 25 31 75...

Страница 41: ...1 M401027 98 800 8001 10 000 2441 3050 46 0 0810 2 1 M401003 88 400 75 Pound Natural Gas 2001 4000 610 1220 29 0 1360 3 4 3 M400997 151 800 4001 6000 1221 1830 30 0 1285 3 3 M401021 138 600 6001 8000...

Страница 42: ...umble dryer before servicing Close gas shut off valve to gas tumble dryer before servicing Close steam valve to steam tumble dryer before servicing Never start the tumble dryer with any guards panels...

Страница 43: ...circuit conductors and connected to the appropriate ground location Metal conduit and or BX cable is not considered ground Connecting the Neutral from the electrical service box to the tumble dryer g...

Страница 44: ...ments 70420301 EN 42 Service Ground Location Figure 20 Model Ground and Terminal Block Locations Non CE CE TMB2269N Terminal Block TMB2269N Ground Electrical Service Junction Box TMB2247N Terminal Blo...

Страница 45: ...breaker Connect the wire leads to the appropriate labeled terminal on the terminal block The ground wire must be connected to the ground connection as shown in Figure 20 3 Check the electrical servic...

Страница 46: ...literature packet must be installed over the power leads during connection of electrical service The ferrite protects the sensitive electronic controls from destructive electrical disturbances which m...

Страница 47: ...hasing and causing premature failure of the motor s 7 Serial Plate Rating Terminal Block Connections Required Serial Plate Amps Recommended Circuit Nonreversing Reversing Breaker Rating Wire Size AWG...

Страница 48: ...ating Wire Size AWG mm2 120V 60Hz 1ph L1 Neutral and ground 13 8 N A 20A 1 pole 12 3 31 200 208V 60Hz 1ph L1 Neutral and ground 7 6 N A 15A 1 pole 14 2 08 200 208 240V 60Hz 1ph L1 L2 and ground 7 6 N...

Страница 49: ...nnected to its own individual branch circuit breaker not fuses to avoid the possibility of single phasing and causing premature failure of the motor s Serial Plate Rating Terminal Block Connections Re...

Страница 50: ...rainage cannot be eliminated install a bypass trap to drain condensate from the low point in the steam header to the return In both steam supply and steam return line it is recommended that each have...

Страница 51: ...valve to each steam trap 5 Connect to the condensate return lines 6 For steam solenoid valve wiring connections refer to Wiring Diagram supplied with tumble dryer Thermal Oil Prep It is the responsib...

Страница 52: ...s 1 Supply 8 18 in 457 mm Drop 2 12 in 305 mm Riser 9 Solenoid Valve Supplied with machine 3 Shut Off Valve 10 Steam Bonnet 4 Condensate Return Line from Supply Line 11 Flexible Line 5 Return 12 Union...

Страница 53: ...s is available The control is shipped from the factory programmed with 1 minute of minimum heat time preset with 7 additional minutes of drying time dipswitches 1 2 and 3 in ON position and 1 minute o...

Страница 54: ...ON OFF OFF 12 ON ON OFF ON OFF OFF 13 OFF OFF ON ON OFF OFF 14 ON OFF ON ON OFF OFF 15 OFF ON ON ON OFF OFF 16 ON ON ON ON OFF OFF 17 OFF OFF OFF OFF ON OFF 18 ON OFF OFF OFF ON OFF 19 OFF ON OFF OFF...

Страница 55: ...F ON ON OFF ON 46 ON OFF ON ON OFF ON 47 OFF ON ON ON OFF ON 48 ON ON ON ON OFF ON 49 OFF OFF OFF OFF ON ON 50 ON OFF OFF OFF ON ON 51 OFF ON OFF OFF ON ON 52 ON ON OFF OFF ON ON 53 OFF OFF ON OFF ON...

Страница 56: ...attern that flares to the right and left indicates no air is flowing through the tumble dryer Correct air and gas mixture is indicated if the flame pattern is primarily blue with small yellow tips and...

Страница 57: ...flow switch bracket may need to be checked for proper alignment Be sure the locator pins are securely in their respective holes before tightening the bracket mounting screws This will assure proper al...

Страница 58: ...y applying light thumb pressure approximately 5 pounds 0 35 bar at a point midway between the sheave and motor pulley Proper tension is when each cylinder belt can be depressed approximately 0 19 inch...

Страница 59: ...ystems LLC DO NOT COPY or TRANSMIT Adjustments 57 70420301 EN Figure 25 TMB2244N 1 Poly V Belt Self Adjusting 4 Drive V Belt 2 Idler Housing Bolts 2 5 Idler Housing Assembly 3 Adjusting Bolt TMB2244N...

Страница 60: ...COPY or TRANSMIT Adjustments 70420301 EN 58 Figure 26 TMB2283N 1 Locking Bolt 5 Guide Rail 2 Adjusting Nut 6 Idler Housing Bolts 2 3 Adjusting Screw 7 Adjusting Bolt Not shown 4 Cylinder Belts 8 Drive...

Страница 61: ...to be removed from service perform the following steps where applicable Turn off electrical supply external to machine Turn off electrical disconnect on machine Turn off gas supply external to machin...

Отзывы: