© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
25
70420301 (EN)
Required for CE Models Only
Once machine is installed, please be sure to complete
the following items:
•
Review and verify machine operation with
customer.
•
Leave all literature and a signed Declaration of
Conformity with customer.
•
Review machine warranty information with
customer.
•
Apply warning sticker on front panel of machine,
in language appropriate to country of sale
(included in literature packet).
Installing CE Gas Drying Tumble
Dryers
General Information
This information is to be used when installing gas
tumble dryers in countries and/or on gases different
than the machine’s factory configuration. Tumble
dryers are supplied from the factory for operation on
Natural Gas 1000 Btu/cu. ft. (8914 kcal/m
3
), or L.P.
Gas 2500 Btu/cu. ft. (22,250 kcal/m
3
),in the countries
of GB/IE/PT/ES/IT/GR/LU/CH. To install machines
in any other country, or on any other gas, requires
some level of modification.
Machines are built in two different configurations:
•
Natural Gas
– regulated/governor
•
Liquefied Petroleum (L.P.) Gas
– not regulated/
no governor
Machines configured for Natural Gas (regulator/
governor) may be converted to L.P. Gas (not regulated/
no governor) with block-open kit, Part No. M400763.
Serial plates supplied from the factory are configured
for GB/IE/PT/ES/IT/GR/LU/CH. These instructions
pertain to the situations when the country of use or gas
supply is different than that on the serial plate.
describes the different gases that are available
in different CE countries, and how the machines need
to be configured to operate with those gases. In the
CE, there are Natural Gas configurations that do not
allow for machine regulation and L.P. Gas
configurations that must be regulated. For L.P. Gas,
third family B/P at 50 mbar, order Regulated Natural
Gas machines and convert according to
WARNING
To reduce the risk of electric shock, fire,
explosion, serious injury or death:
• Disconnect electric power to the tumble
dryer before servicing.
• Close gas shut-off valve to gas tumble
dryer before servicing.
• Close steam valve to steam tumble
dryer before servicing.
• Never start the tumble dryer with any
guards/panels removed.
• Whenever ground wires are removed
during servicing, these ground wires
must be reconnected to ensure that the
tumble dryer is properly grounded.
W002R1
Содержание YT050E
Страница 2: ......