CLEANING THE CHAMBER PIPE  

 

 

Clean the chamber pipe every 10-15 days. 

 

When the firebox is taken out, clean the dirty sides of the chamber with a brush. 

 

Clean the inside of all boiler exchanger pipes located on the upper side of the exchanger (Figure 11a) by moving the 

brush up and down. It has 11 pipes. They are not visible from the front side. Find them with your hands. 

 

Vacuum clean the interior of the chamber (Figure 11b). 

 

Return the cleaned firebox on the firebox support and fix it with the handrail on the firebox support by lowering the 

firebox handrail (forward, down) to the lower position (so that you hear jumps when fixing the handrail) (Figure 11c). 

 

Take care that the non-asbestos tape on the underside of the firebox stays in its place and is not damaged. If damaged, 

replace it with a new one and seal it with high temperature resistant silicone (approximately 1000 ° C). 

 

 

   

Figure 11a 

 

 

 

Figure 11b 

 

 

 

Figure 11c 

 

 

CLEANING THE UPPER ASHTRAY AND SPACE AROUND THE UPPER A SHTRAY

 

 

Clean the upper ashtray every 3-4 days. 

 

Open the lower exterior door of the boiler (Figure 12a). 

 

Unblock the fixed ashtray with both hands by moving the ashtray handrail forward and by lowering it (Figure 12b). 

 

Take the upper ashtray out and pour the ashes into the garbage bin. 

 

Then clean the ashtray and the space around the ashtray (in the boiler ) with the vacuum cleaner (Figure 12c).  

   

  

 

Figure 12a              

                Figure 12b 

 

 

Figure 12c 

 

 

CLEANING THE FIREBOX SUPPORT BOTTOM  

 

When the upper ashtray is taken out, it is necessary to clean the bottom of the firebox support. It is located in the upper 

part of the space around the upper ashtray. 

 

Clean it every 3-4 days. 

 

Loosen the two butterfly nuts and remove the lid (Figure 13a). 

 

Use the vacuum cleaner through the rectangular opening to vacuum the bottom of the firebox support (Figure 13b).  

 

Return the lid in its place and tighten with the butterfly nuts (Figure 13c). 

 

Make sure that the non-asbestos tape on the underside of the lid stays in its place and that it does not get damaged. If 

damaged, replace it with a new one and seal it with high temperature resistant silicone (approximately 1000 ° C). 

 

In the end, return the upper ashtray and fix it with the ashtray handrail by moving the ashtray handrail upwards and 

then back (Figure 12b). 

 

Make sure that the non-asbestos tape on the underside of the ashtray stays in its place and that it does not get 

damaged. If damaged, replace it with a new one and seal it with high temperature resistant silicone (approximately 1000 ° C).  

                

            

 

Figure 13a 

 

 

Figure 13b             

               Figure 13c

 

 

Содержание COMMO COMPACT 32

Страница 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Страница 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Страница 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Страница 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Страница 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Страница 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Страница 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Страница 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Страница 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Страница 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Страница 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Страница 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Страница 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Страница 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Страница 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Страница 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Страница 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Страница 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Страница 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Страница 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Страница 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Страница 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Страница 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Страница 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Страница 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Страница 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Страница 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Страница 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Страница 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Страница 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Страница 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Страница 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Отзывы: