background image

 

 

PURPOSE OF THIS MANUAL 

 
The purpose of this Manual is to instruct the user how to take all necessary safety measures and ensure that all necessary 

actions that will guarantee the proper and safe use of this heating device will be undertaken. 
UPDATES 
  

This Manual takes into account all the advanced technologies that existed at the time this pellet boiler was placed on 

the market. 
  

This Manual does not take into account the boiler s already on the market with appropriate technical documents and 

which may not be considered faulty or inadequate after any modifications, adaptations or application of new technologies to 
newly launched products. 
  

This  booklet  should  be  read  and  studied  carefully.  All  information  provided  in  this  booklet  should  be  considered 

necessary for the proper installation, use and maintenance of your boiler . 
  

This Manual should be kept in a safe place. This Installation, Operation and Maintenance Manual is considered to be 

an integral part of the pellet boiler . 

If the boiler is resold to another person, the new owner must also be given this Manual.    
If you lose this booklet, you can ask the manufacturer or authorized seller for a new one.    
 

 

RESPONSIBILITY OF THE MANUFACTURER 

 
By delivering this manual, “Alfa Plam JSC” shall not accept any legal or criminal liability, either direct or indirect, for: 

 

Accidents and/or damage occurred due to the non-observance of the standards and specifications stated in this Manual,   

 

Accidents and/or damage occurred due to the improper operation or use of the boiler by the user,   

 

Accidents and/or damage occurred due to any modifications and repairs not approved by “Alfa Plam JSC”,  

 

Poor maintenance,   

 

Unpredictable events,   

 

Accidents and/or damage occurred due to the use of spare parts that are not original spare parts or inappropriate.   
The installer of the boiler shall take the full responsibility for the installation.   
 

 

REQUIRED GENERAL STANDARDS  

The boiler user must be an adult and responsible person. 
Make sure that children do not approach the boiler while in operation, with the intention of playing.  
Children must not approach the boiler while in operation with the intention of playing. This appliance can be used by 

children aged 8 and older and persons with reduced physical, sensory or mental abilities, if they are supervised by an adult 
who is familiar with the instructions for use. Boiler cleaning and maintenance cannot be performed by children without the 
supervision of an adult. 

 

 

HARMONIZED STANDARDS 

-  EN 303-5;  
-  EN 50581;  
-  EN 61000-6-2;  
-  EN 61000-6-3;  
-      EN 60335-1;  
-  EN 60335-2-102;  
-  EN 62233;  
-  Commission Regulation (EU) 2015/1189. 
 

 

TRANSPORTING AND MOVING THE PELLET  BOILER 

 

   

When moving the boiler , take care of your own safety. 

Before transporting and moving the pellet boiler , which must be carried out absolutely safely, ensure that the forklift 

truck has a carrying capacity sufficient for lifting the boiler . Avoid sudden movements and /or improvised ways to move the 
boiler . Lifting, moving and repositioning your boiler can be carried out by means of rod-like boiler supports that have a thread 
at one end. These supports (4 pieces) are wound up to the designated places on both sides of the boiler (Figure 1). This activity 
should be carried out by 4 people. Boiler supports are delivered with the boiler ! 
Note: 
When moving the device, it should be taken into account that it is much heavier in its front part because the boiler itself is located 
in that part of the device! 
ALL THE PACKAGING MATERIAL SHOULD BE REMOVED AWAY FROM THE REACH OF CHILDREN. THE MATERIALS 
CONTAINED IN THE PACKAGING (BAGS, FILMS,
 POLYSTYRENE, ETC.) MAY CAUSE SUFFOCATION. 
 

 

RESPONSIBILITY OF THE INSTALLER  

The installer is responsible to check if the installation and the air supply function properly and if all the requirements 

required for the installation of the pellet boiler have been fulfilled. 

The installer is to ensure that the boiler is in compliance with local regulations applicable in the place where the boiler is 

installed.  

The boiler must be used in accordance with the instructions given in this Installation, Operation and Maintenance Manual, 

as well as with all the safety standards prescribed by local legal regulations applicable in the place where the boiler is 
installed.  

The installer’s obligations are defined by the SRPS 10683 Standard. The installer must verify:   

 

The type of the boiler that is being installed,   

Содержание COMMO COMPACT 32

Страница 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Страница 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Страница 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Страница 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Страница 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Страница 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Страница 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Страница 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Страница 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Страница 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Страница 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Страница 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Страница 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Страница 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Страница 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Страница 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Страница 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Страница 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Страница 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Страница 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Страница 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Страница 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Страница 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Страница 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Страница 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Страница 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Страница 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Страница 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Страница 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Страница 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Страница 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Страница 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Отзывы: