Whether the room in which the boiler is being installed is appropriate, i.e. minimum size of the room in which the 

boiler is to be installed,  

 

 Compliance with the flue gas regulations set forth in the instructions supplied by the manufacturer of the heating 

device 

 

The internal chimney diameter, the material the chimney is made of, whether it is flat and has a regular shape, 

whether there are any obstacles and barriers in the chimney,  

 

The height and vertical extension of the chimney,     

 

The existence and suitability of a wind resistant protective cap of the chimney,   

 

The possibility of providing the external air intake, 

 

The possibility of the simultaneous use of the heat source with other equipment already existing in that place.   

If the above mentioned standards have been satisfied, then the installer may proceed with the installation of the boiler . 

The instructions provided by the boiler manufacturer, as well as the fire prevention standards and safety standards must be 
observed.    

After the boiler has been turned on for the first time, the system must be put into a trial operation for at least 30 minutes in 

order to check that all the required conditions have been met. 

Once the installation has been carried out, the installer is obliged to provide the client with the following:   

 

Installation, Operation and Maintenance Manual issued by the boiler manufacturer (if such a manual has not been 

delivered with the boiler ),   

 

The documents required by applicable regulations, 

 

The installer must teach the client how to handle the device, how to perform regular maintenance and cleaning. 

 

 

INSTALLATION 

 

The buyer shall be fully responsible for the activities carried out at the installation site.   
Prior to installing the boiler , the installer should check if all the safety requirements are met, particularly the following: 

 

The installer is to ensure that the boiler installation is in accordance with local, national and European standards. 

 

The installer is to adhere to all requirements stated in this document. 

 

The installer is to check whether the air supply pipes correspond to the type of the installed boiler . 

 

The electrical connections must not be executed with the use of temporary and/or unsuitable cables.  

 

The installer is to check the grounding of the electrical installation. 

 

The installer must always use personal protective equipment and observe all prescribed precautionary measures. 

 

The installer must always leave enough space for maintenance work. 

 

After completion of the installation, the installer is to measure the emission of flue gases.   

          

 

PLACING THE BOILER  

We advise you to unpack the boiler only when it is put in the place where it is to be installed. 

If the surrounding walls or floor are made of materials that are not heat resistant, appropriate protection made of 
incombustible insulation material should be used.   

In order to protect the floor from inflammable materials, you should put a metal plate 3 to 4 mm thick on the floor 

under the boiler that would protrude for 30 cm ahead of the boiler front.   
The pellet boiler should be installed in accordance with the diagram which determines the distance from the walls (Figure 2). 

 

Figure 2 

All minimum safety distances are indicated on the product data plate, DO NOT use lower values than specified (see 

INFORMATION ON CE MARKING). 

. If the pellet boiler is installed in a boiler room where there are other air suction devices (other boiler s, various types of 

suction fans, etc.), make sure that the volume of air entering the room is satisfactory to guarantee the safe operation of the 
boiler . 

If the chimney passes through the ceiling, it must be sufficiently insulated with a non-inflammable insulating 

material.  

Once the boiler is placed, it should be levelled (brought to a horizontal position) with its adjustable legs. It is desirable 

that the back of the boiler is raised to be 5-6mm higher than the front part so that the air from the upper part of the boiler may 
be discharged completely. 

 

The smoke discharge system MUST NOT be connected to:   

 

The flue pipe used by another heat generator (boiler s, furnaces, fireplaces, etc.),   

 

The air exhaust system (hoods, suction fans, etc.).   

 

It is forbidden to install flue gas flow control units! 

Содержание COMMO COMPACT 32

Страница 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Страница 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Страница 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Страница 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Страница 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Страница 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Страница 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Страница 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Страница 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Страница 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Страница 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Страница 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Страница 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Страница 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Страница 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Страница 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Страница 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Страница 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Страница 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Страница 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Страница 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Страница 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Страница 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Страница 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Страница 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Страница 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Страница 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Страница 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Страница 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Страница 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Страница 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Страница 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Отзывы: