background image

10 

 

 

CLEANING THE LOWER ASHTRAY  

 

Clean the lower ashtray every 10-15 days. 

 

Open the lower exterior door of the boiler (Figure 12a). 

 

Loosen the two butterfly nuts (Figure 14a). 

 

Take the lower ashtray out and pour the ash into the garbage bin (Figure 14b). 

 

Then, clean the ashtray with the vacuum cleaner and the space around the ashtray (in the boiler ) to the left, right and 

in the depth of the space (Figure 14c). 

 

Finally, put the ashtray back in its place and tighten the butterfly nuts. 

 

Take care that the non-asbestos tape on the underside of the ashtray stays in place and that it does not get 

damaged. If damaged, replace it with a new one and seal with high temperature resistant silicone (approximately 1000 ° 
C).  

                

            

 

Figure 14a 

 

 

Figure 14b                               Figure 14c 

 

 

CLEANING THE UPPER CHAMBER  

 

Clean every time the tank is filled with pellets. 

 

Raise the furnace lid, and then push the blade rod which ends in a Bakelite handle forward-back 3 - 4 times (Figure 15). 

 

After cleaning, leave the rod in the last position (to be as visible as possible).   

 

Make sure that the Bakelite handle does not unfasten and does not fall to the bottom of the tank. 

 

 

CLEANING THE HEAT EXCHANGER   

 

Clean every time the tank is filled with pellets. 

 

Open the upper exterior door of the boiler (Figure 10a). 

 

Cleaning is done by moving the mechanism handrail left - right 3 - 4 times (Figure 16a). 

 

After cleaning, leave the mechanism in the zero position (in central and vertical position, turned down) (Figure 16b).  

                       

               

 

Figure 15 

 

 

Figure 16 

 

 

Figure 16a 

 

Contact the installer if you need any further clarifications. The manufacturer does not have direct supervision over the work 

of the installer and cannot guarantee for the performed works or maintenance works. 

In no case does the manufacturer assume responsibility for damages caused by third parties. 

 

Make sure that the pellet boiler and ash in it are cool. 

The incompletely burned pellet must never be returned to the pellet tank or thrown into the ash container. 
 

 

CHECK-UP AND PARTS TO BE MAINTAINED  

CHECK  THE  BELOW  LISTED  FACTS  SO  AS  TO  ENSURE  THAT  YOUR  PELLET  BOILER  FUNCTIONS  PROPERLY.  THESE 

PRECAUTIONARY MEASURES GUARANTY BEST PELLET BOILER AND TEMPERATURE PERFORMANCE IN THE SYSTEM: 

 
GENERAL CLEANING AT THE END OF THE HEATING SEASON   
 

Make sure that the pellet boiler and ash are cool. Unplug the power cable of the boiler .  

 

At the end of the heating season, unplug the power cable of the boiler . It is very important to clean 

and check the boiler as it is explained in this Manual.   

 

The door seal can be detached after a while even though it is fastened with high temperature resistant adhesives. For 

re-fixing, apply a high temperature resistant adhesive (about 1000 ° C) to the back of the seal. This will ensure that the firebox 
door is sealed. 

 
CONNECTION OF THE FLUE PIPE TO THE CHIMNEY (at the end of each heating season it should be cleaned). 

Make sure that the pellet boiler and ash are cool. 
 

 

The  flue  pipe,  chimney  and  chimney  cap  should  be  inspected  and  cleaned  once  a  year.  In  order  to  take  the 
procedure professionally, contact a chimney sweep. 

 

 

ADDITIONAL MAINTENANCE 

Your pellet boiler is a heat source which may use only pellets. Once a year, the maintenance of the boiler should be carried 

out by a person authorized by the company “Alfa Plam JSC”. 

Содержание COMMO COMPACT 32

Страница 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Страница 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Страница 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Страница 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Страница 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Страница 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Страница 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Страница 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Страница 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Страница 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Страница 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Страница 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Страница 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Страница 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Страница 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Страница 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Страница 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Страница 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Страница 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Страница 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Страница 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Страница 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Страница 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Страница 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Страница 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Страница 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Страница 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Страница 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Страница 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Страница 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Страница 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Страница 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Отзывы: