May 2007
Installing the Hardware
7
Lifting the Chassis
Once its weight has been reduced by removing the power
supplies, the chassis can be lifted from the packaging material
and moved to the location where it is to be installed (see
important note below).
Important.
Two people are required to lift the chassis.
Due to its weight, lifting the chassis unassisted can cause
personal injury.
Once the chassis has been removed from the packaging,
continue to “Mounting the Switch” below.
Mounting the Switch
Note.
Due to their weight and airflow requirements,
OmniSwitch 9000 Series switches cannot be wall-
mounted.
Airflow Considerations
Be sure that your switch is placed in a well-ventilated, static-
free environment. Always allow adequate clearance at the
front and sides of the switch, as well as behind the switch’s fan
unit (located at the top-rear of the chassis). The following top-
view diagram shows recommended minimum clearances for
adequate airflow:
Never obstruct the air intake vents located at the bottom-front
and bottom-sides of the chassis or the fan unit’s air output
vents located at the rear of the chassis.
}
}
Rear.
6 inches minimum
at rear of chassis fan
unit.
Front.
6 inches minimum
at front of chassis.
Sides.
2 inches minimum
at left and right sides.
Chassis Top View
Содержание OmniSwitch 9000 Series
Страница 1: ...060210 10 Rev D June 2007 OmniSwitch 9000 Series Getting Started Guide...
Страница 43: ...May 2007 Using WebView 39...
Страница 44: ...40 Using WebView May 2007...