21.3. OPERATING CHECK LIST
21.3.1. GENERAL
Cheek for any unusual noises or vibration in the running components, particularly the fan drive system.
21.3.2. PHASE ROTATION PROTECTION
If the phase of the power supply are not correct, the phase rotation protection device will prevent the machine
from starting.
21.3.3. ELECTRICAL
21.3.3.1. OPERATING VOLTAGE:
Recheck voltage at unit supply terminals.
21.3.3.2. CONTROL
1. Verify all sensor inputs, using the controller display.
21.3.4. FAN & DRIVE
21.3.5. COMPRESSOR AND REFRIGERATION SYSTEM
1. Check that the fans rotate freely, in a balanced manner without any rubbing.
1. Checking operation: Start the
Aqu@ Scop HT Split
. Check for any abnormal noises or vibrations.
2. After a few minutes operation, the evaporator outlet superheating should be:
3K (±1K) with C2 compressor operating on its own,
5K (±1K) with C1 + C2 compressors or C1 operating on its
own. (*)
* These checks can be performed at the time of commissioning with the help of
qualified technical personnel.
1. All panels and fan guards are in place and secured.
2. Unit clean and free of remainder installation material.
21.3.6. FINAL CHECK
Содержание Aqu@Scop HT SPLIT 12-6
Страница 2: ......
Страница 59: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 79: ......
Страница 80: ......
Страница 81: ......