Setup and Test
99
2
Green
Card busy LED, to indicate live traffic is present
and should not be removed.
OFF
SC
Position
Colour
Description
Status
TOP
1
Red
Card failure LED, which shall be alight if the card
self test fails
OFF
OK Card is Active.
PSU
Position
Colour
Description
Status
TOP 1
Red
FUSE FAIL: Illuminated if either input fuse has
blown.
OFF
2
Green
OK Card is Active.
ON
3
Red
I/P A FAIL input voltage A (BATTNEG0) not
present
OFF
4
Red
I/P B FAIL input voltage B (BATTNEG1) not
present
OFF
5
Red
O/P OVERLOAD.
OFF
6
Red
O/P UNDERLOAD
OFF
Access Concentrator Shelf Card LED Indications.
Self Test (Test 4)
1. Select CTU card on shelf view double click the card, or click right mouse button and
select Airspan (card type) View
2. Execute the self test function (using Netspan) on each CTU card and ensure that it
passes. Replace any faulty cards.
Test CTU cabling to the DDF E1 Cards
1. Using Netspan create a CT rack with a dummy modem shelf.
2. From the Edit AC Shelf Properties screen assign E1-1 to the newly created CT shelf.
3. A red alarm should appear on the CTU card for the E1 activated.
4. Loopback TX to RX for the E1 (T1) at the DDF. Check that the alarm clears (the
amber remote alarm is lit for several seconds before clearing).
5. Reassign the CT shelf to E1-2, E1-3 and E1-4 in turn and repeat steps 3 and 4 (E1-5
to E1-8 for 120ohm connection).
6. Repeat steps 1 to 5 for CTUs in slots 5 and 6 if fitted.
Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
Содержание AS4000
Страница 2: ......
Страница 6: ...Printed Documentation 2 ...
Страница 14: ...Printed Documentation 10 ...
Страница 16: ...Printed Documentation 12 ...
Страница 27: ...Installation 23 Typical 75ohm DDF Layout ...
Страница 28: ...Printed Documentation 24 ...
Страница 38: ...Printed Documentation 34 AC Rack Labeling The racks should be labelled as shown below Access Concentrator Rack ...
Страница 39: ...Installation 35 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 41: ...Installation 37 ...
Страница 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Страница 43: ...Installation 39 Type 43 Terminations to Coax ...
Страница 44: ...Printed Documentation 40 ...
Страница 52: ...Printed Documentation 48 ...
Страница 68: ...Printed Documentation 64 ...
Страница 69: ...Installation 65 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 71: ...Installation 67 ...
Страница 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Страница 73: ...Installation 69 BNC Terminations to Coax ...
Страница 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Страница 75: ...Installation 71 ...
Страница 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Страница 110: ...Printed Documentation 106 ...
Страница 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Страница 133: ...Setup and Test 129 ...
Страница 151: ...Setup and Test 147 11 From the AS4020 front panel exit commissioning mode by selecting RF Commissioning Off ...
Страница 163: ...Setup and Test 159 ...
Страница 166: ......
Страница 170: ...Printed Documentation 166 ...
Страница 176: ...Printed Documentation 172 ...
Страница 192: ......