Installation
5
Air conditioning is installed and funtional (if required to maintain room environment).
Adequate grounding is provided.
Access to the equipment room will be adequate for normal handling and movement.
Adequate lighting is available for carrying out the installation.
Any non compliance with acceptable standards should be bought to the customers
attention and resolved before proceeding with the installation.
Power Availability
From
the site survey, confirm the location of the fuse position for the negative battery
supply and the return point required for each rack. Also locate the fuse position for the
alarm unit power supply.
Site Earth
Confirm the position of the grounding point using the site survey.
Flooring
Ensure that flooring is substantial enough to support the rack and can provide a secure
fixing.
Cable Trays
Verify that cable trays are installed to provide routing to the proper destinations and are of
adequate strength
Delivery Inspection
Upon taking delivery of the equipment consignment, check that the consignment agrees in
all particulars with the consignment delivery documentation (number of boxes,
descriptions, and the contents of boxes, etc.). Any discrepancy or damage must be
reported immediately to ACC for further instructions. In case of severe damage, do not
accept the consignment from the carrier. See Material Return and Repair document for
further details. The equipment is normally shipped as shown below.
If subsequent to the initial shipment incremental upgrades are made to the system the
equipment will be delivered in packaging of size and type suitable for that shipment.
Unpacking Inspection
The contents of each box must be checked against the relevant part lists provided with the
box, for the correct part numbers and quantities, and for damage. Any shortage or
damaged items must be reported immediately to Airspan Networks International Call
Centre for further instructions at the address given in the Contact Information section of
this manual or:
TELEPHONE: +44 (0) 1895 467 467
FAX: +44 (0) 1895 467472
Email: [email protected]
Dispose of all unnecessary packaging in a safe manner according to the
customer’s requirements.
During UK working hours, the Airspan Shipping Department can be contacted at:
Tel:+44 1895 467 444 or +44 1895 467 444
Fax:+44 1895 467 438
Содержание AS4000
Страница 2: ......
Страница 6: ...Printed Documentation 2 ...
Страница 14: ...Printed Documentation 10 ...
Страница 16: ...Printed Documentation 12 ...
Страница 27: ...Installation 23 Typical 75ohm DDF Layout ...
Страница 28: ...Printed Documentation 24 ...
Страница 38: ...Printed Documentation 34 AC Rack Labeling The racks should be labelled as shown below Access Concentrator Rack ...
Страница 39: ...Installation 35 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 41: ...Installation 37 ...
Страница 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Страница 43: ...Installation 39 Type 43 Terminations to Coax ...
Страница 44: ...Printed Documentation 40 ...
Страница 52: ...Printed Documentation 48 ...
Страница 68: ...Printed Documentation 64 ...
Страница 69: ...Installation 65 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 71: ...Installation 67 ...
Страница 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Страница 73: ...Installation 69 BNC Terminations to Coax ...
Страница 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Страница 75: ...Installation 71 ...
Страница 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Страница 110: ...Printed Documentation 106 ...
Страница 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Страница 133: ...Setup and Test 129 ...
Страница 151: ...Setup and Test 147 11 From the AS4020 front panel exit commissioning mode by selecting RF Commissioning Off ...
Страница 163: ...Setup and Test 159 ...
Страница 166: ......
Страница 170: ...Printed Documentation 166 ...
Страница 176: ...Printed Documentation 172 ...
Страница 192: ......