Printed Documentation
72
Central Terminal Card Installation
The CT rack is shipped with shelves fitted to customer requirements and internal cabling
complete.
Preliminary
In a new installation ensure that the CT Circuit Breakers located on the lower assembly of the
Combiner Shelf are set to the OFF position (Down). See and that the breakers on the Fuse
and Alarm panel of the Expansion Rack are switched are set to the OFF position (down) See.
Warning:
Before handling any cards or modules, observe full anti-static
precautions
CAUTION PA INSERTION
Care should be taken when installing PAs to ensure that the card connector mates with the
backplane connector correctly. Any attempt to ram the card home or force the card into he
slot may cause damage to the connector. Insert the card until the connectors engage, ease
the card into the backplane until fully engaged. Lock top and bottom with a screwdriver. If
resistance is met, remove the card and reinsert. If difficulty persists contact the Airspan
service centre.
CAUTION DIP/LNA INSERTION
Care should be taken when installing DIP/LNAs to ensure that the card connector mates with
the backplane connector correctly. Any attempt to ram the card home or force the card into he
slot may cause damage to the connector. The board extractor levers may be used to assist
with insertion, when the card is home press the body of the DIP/LNA to ensure that the
connector is fully engaged. If resistance is met remove the card and reinsert. If difficulty
persists contact the Airspan service centre.
WARNING:
Isolation of power from the rack is only achieved by ensuring that both
circuit breakers are in the off position.
Part of RF Combiner Shelf showing Circuit Breakers.
Содержание AS4000
Страница 2: ......
Страница 6: ...Printed Documentation 2 ...
Страница 14: ...Printed Documentation 10 ...
Страница 16: ...Printed Documentation 12 ...
Страница 27: ...Installation 23 Typical 75ohm DDF Layout ...
Страница 28: ...Printed Documentation 24 ...
Страница 38: ...Printed Documentation 34 AC Rack Labeling The racks should be labelled as shown below Access Concentrator Rack ...
Страница 39: ...Installation 35 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 41: ...Installation 37 ...
Страница 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Страница 43: ...Installation 39 Type 43 Terminations to Coax ...
Страница 44: ...Printed Documentation 40 ...
Страница 52: ...Printed Documentation 48 ...
Страница 68: ...Printed Documentation 64 ...
Страница 69: ...Installation 65 Interface Connections This page contains miscellaneous interface and connector details ...
Страница 71: ...Installation 67 ...
Страница 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Страница 73: ...Installation 69 BNC Terminations to Coax ...
Страница 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Страница 75: ...Installation 71 ...
Страница 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Страница 110: ...Printed Documentation 106 ...
Страница 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Страница 133: ...Setup and Test 129 ...
Страница 151: ...Setup and Test 147 11 From the AS4020 front panel exit commissioning mode by selecting RF Commissioning Off ...
Страница 163: ...Setup and Test 159 ...
Страница 166: ......
Страница 170: ...Printed Documentation 166 ...
Страница 176: ...Printed Documentation 172 ...
Страница 192: ......