5. Periodic Inspection/Maintenance
5
-
2
5.2 Daily Inspection and Keeping Operation Log
Be sure to carry out daily inspection every morning before operation. See Chapter 4 “OPERATION”
of the manual for the details of inspection.
Pay attention to and carefully observe the following points during daily operation or inspection and
maintenance work. If any trouble or abnormality is found, immediately investigate its cause and
make repairs. If the cause is unknown or not traceable, or if the trouble involves a part or compo-
nent not described in the manual, ask your nearest dealer for information.
(a) Controls and instruments function properly.
(b) Quantity and any leak of water, fuel, and oil or
any contamination should be checked.
(c) Appearance, abnormal noise or excessive heat
should be checked.
(d) Loose bolt or nut should be checked.
(e) Any damage, wear or shortage of machine
components and parts should be checked.
(f) Performance of each part or component should
be proper
.
Keep the operation log to record constant inspection of each component, so that trouble of the ma-
chine can be easily discovered and preventive measures can be taken.
It is very useful to record information such as frequency, temperature, current, maintenance items
and replenishment of lubricant on a daily maintenance log.
5.3 Periodic Replacement of Parts
Air filter is a crucial component for the performance and the life of a unit.
Use genuine part for replacement.
Part number changes upon modification. For replacement of parts, make sure whether the part
number is correct or applicable.
Part Name
Part Number
Quantity
Engine oil filter
ISUZU 113240 2321
1
Air filter element
32143 12700
1
Fuel filter
ISUZU 113240 0791
1
Filter inside Fuel Air-bleeding
Electric Pump
ISUZU 894337 0220
1
V-belt
ISUZU 113671 3270
1
Fuel feed pump gasket
ISUZU 9-0957-2014-0
6
Sedimenter gasket
ISUZU 9-0957-2014-0
2
TR0049
Use our genuine elements
Содержание SDG60S-7A6
Страница 1: ......
Страница 12: ...2 Part Names 2 1 2 1 Internal Components A070010 1 1 2 3 4 5 6 7 8 9 10 16 15 14 13 12 11...
Страница 56: ...8 Specifications 8 2 8 2 Outline drawing A060509E 1...
Страница 57: ...9 Wiring Diagram 9 1 9 1 Generator Wiring Diagram A050635E...
Страница 58: ...9 Wiring Diagram 9 2 9 2 Engine Wiring Diagram A070003E...
Страница 59: ...10 Piping Diagram 10 1 10 1 Fuel piping A070103E 1...
Страница 61: ......